IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0690 # 10 Y:2004 10 2004 STANDARDIZE MOTOR INVENTORY $952 $340 Not Implemented
UD0690 # 11 Y:2004 11 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $352 $0 Implemented
UD0690 # 12 Y:2004 12 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $430 $170 Implemented
LL0182 # 01 Y:2004 01 2004 REPLACE BOILER $172,411 $79,000 Not Implemented
LL0182 # 02 Y:2004 02 2004 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $54,044 $325,479 Not Implemented
LL0182 # 03 Y:2004 03 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $49,248 $33,150 Implemented
LL0182 # 04 Y:2004 04 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $35,377 $500 Implemented
LL0182 # 05 Y:2004 05 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $35,354 $60,000 Implemented
LL0182 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,593 $12,360 Implemented
LL0182 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $18,697 $3,264 Implemented
LL0182 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,036 $74,480 Implemented
LL0182 # 09 Y:2004 09 2004 USE POWER DURING OFF-PEAK PERIODS $7,577 $8,004 Implemented
LL0182 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,481 $1,542 Implemented
LL0182 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,164 $1,680 Implemented
LL0182 # 12 Y:2004 12 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,268 $9,300 Implemented
AS0373 # 01 Y:2004 01 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,560 $8,230 Not Implemented
AS0373 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $504 $456 Not Implemented
AS0373 # 03 Y:2004 03 2004 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $337 $1,400 Not Implemented
AS0373 # 04 Y:2004 04 2004 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $28,518 $60,100 Not Implemented
AS0373 # 05 Y:2004 05 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,794 $3,500 Not Implemented
IA0338 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $457 $189 Implemented
IA0338 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,036 $20 Implemented
IA0338 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $895 $2,750 Implemented
IA0338 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,854 $5,572 Implemented
IA0338 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $462 $0 Implemented