Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0344 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $27,000 | $850 | Not Implemented |
AM0344 # 04 Y:1999 | 04 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,800 | $0 | Implemented |
AM0344 # 05 Y:1999 | 05 | 1999 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,150 | $140 | Implemented |
AM0344 # 06 Y:1999 | 06 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $610 | $0 | Implemented |
AM0344 # 07 Y:1999 | 07 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $205 | $250 | Implemented |
KU0513 # 01 Y:1999 | 01 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $166,610 | $85,440 | Implemented |
KU0513 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,800 | $700 | Implemented |
KU0513 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $3,080 | $4,830 | Implemented |
KU0513 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,450 | $1,810 | Not Implemented |
KU0513 # 05 Y:1999 | 05 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $950 | $1,000 | Implemented |
KU0513 # 06 Y:1999 | 06 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $1,250 | $1,000 | Implemented |
KU0513 # 07 Y:1999 | 07 | 1999 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $23,400 | $61,400 | Implemented |
KU0513 # 08 Y:1999 | 08 | 1999 | MOVE PRODUCT USING MECHANICAL MEANS | $7,210 | $2,360 | Not Implemented |
UL0216 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,573 | $13,951 | Not Implemented |
UL0216 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,059 | $20 | Not Implemented |
UL0216 # 03 Y:1999 | 03 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $160 | $500 | Not Implemented |
UL0216 # 04 Y:1999 | 04 | 1999 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $200,000 | $75,000 | Not Implemented |
WI0342 # 01 Y:1999 | 01 | 1999 | CLEAR AND RENT EXISTING SPACE | $57,832 | $9,205 | Not Implemented |
WI0342 # 02 Y:1999 | 02 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,018 | $1,200 | Not Implemented |
WI0342 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,027 | $3,698 | Not Implemented |
WI0342 # 04 Y:1999 | 04 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $757 | $500 | Implemented |
WI0342 # 05 Y:1999 | 05 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $605 | $959 | Implemented |
WI0342 # 06 Y:1999 | 06 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $326 | $1,380 | Not Implemented |
SD0216 # 01 Y:1999 | 01 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,277 | $1,650 | Implemented |
SD0216 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,961 | $1,060 | Implemented |