IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0344 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $27,000 $850 Not Implemented
AM0344 # 04 Y:1999 04 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,800 $0 Implemented
AM0344 # 05 Y:1999 05 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,150 $140 Implemented
AM0344 # 06 Y:1999 06 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $610 $0 Implemented
AM0344 # 07 Y:1999 07 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $205 $250 Implemented
KU0513 # 01 Y:1999 01 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $166,610 $85,440 Implemented
KU0513 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,800 $700 Implemented
KU0513 # 03 Y:1999 03 1999 INSULATE BARE EQUIPMENT $3,080 $4,830 Implemented
KU0513 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,450 $1,810 Not Implemented
KU0513 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $950 $1,000 Implemented
KU0513 # 06 Y:1999 06 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,250 $1,000 Implemented
KU0513 # 07 Y:1999 07 1999 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $23,400 $61,400 Implemented
KU0513 # 08 Y:1999 08 1999 MOVE PRODUCT USING MECHANICAL MEANS $7,210 $2,360 Not Implemented
UL0216 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,573 $13,951 Not Implemented
UL0216 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,059 $20 Not Implemented
UL0216 # 03 Y:1999 03 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $160 $500 Not Implemented
UL0216 # 04 Y:1999 04 1999 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $200,000 $75,000 Not Implemented
WI0342 # 01 Y:1999 01 1999 CLEAR AND RENT EXISTING SPACE $57,832 $9,205 Not Implemented
WI0342 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,018 $1,200 Not Implemented
WI0342 # 03 Y:1999 03 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,027 $3,698 Not Implemented
WI0342 # 04 Y:1999 04 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $757 $500 Implemented
WI0342 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $605 $959 Implemented
WI0342 # 06 Y:1999 06 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $326 $1,380 Not Implemented
SD0216 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $1,277 $1,650 Implemented
SD0216 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,961 $1,060 Implemented