IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0345 # 09 Y:2003 09 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $15,623 $5,760 Not Implemented
AS0345 # 10 Y:2003 10 2003 CLEAR AND RENT EXISTING SPACE $11,984 $9,060 Not Implemented
AS0345 # 11 Y:2003 11 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $910 $960 Not Implemented
GT0747 # 01 Y:2003 01 2003 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $267 $100 Implemented
GT0747 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,776 $270,000 Not Implemented
GT0747 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $252 $350 Implemented
GT0747 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,740 $0 Implemented
GT0747 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $47,676 $9,250 Not Implemented
GT0747 # 06 Y:2003 06 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,358 $41,789 Implemented
GT0747 # 07 Y:2003 07 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,662 $1,500 Implemented
GT0747 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $451 $135 Not Implemented
WI0437 # 01 Y:2003 01 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $72,831 $56,000 Not Implemented
WI0437 # 02 Y:2003 02 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,938 $72,500 Not Implemented
WI0437 # 03 Y:2003 03 2003 INSTALL TIMERS AND/OR THERMOSTATS $17,126 $3,000 Not Implemented
WI0437 # 04 Y:2003 04 2003 INSTALL AUTOMATIC STACK DAMPER $16,313 $1,500 Not Implemented
WI0437 # 05 Y:2003 05 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,938 $8,555 Not Implemented
AM0431 # 01 Y:2003 01 2003 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $23,400 $240 Implemented
AM0431 # 02 Y:2003 02 2003 OPTIMIZE PLANT POWER FACTOR $5,030 $11,900 Not Implemented
AM0431 # 03 Y:2003 03 2003 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,480 $5,640 Implemented
AM0431 # 04 Y:2003 04 2003 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,100 $0 Implemented
AM0431 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,460 $1,790 Implemented
AM0431 # 06 Y:2003 06 2003 REDUCE HEAT GAIN BY WINDOW TINTING $1,720 $4,460 Not Implemented
AM0431 # 07 Y:2003 07 2003 PAY BILLS ON TIME TO AVOID LATE FEES $750 $0 Implemented
AM0431 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,150 $0 Implemented
AM0431 # 09 Y:2003 09 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,130 $0 Implemented