IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0299 # 08 Y:2005 08 2005 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,408 $8,000 Not Implemented
OR0478 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $11,420 $6,400 Implemented
OR0478 # 02 Y:2005 02 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,500 $1,900 Implemented
OR0478 # 03 Y:2005 03 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,700 $49,100 Implemented
OR0478 # 04 Y:2005 04 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,800 $0 Not Implemented
LM0088 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,003 $300 Not Implemented
LM0088 # 02 Y:2005 02 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $991 $250 Not Implemented
LM0088 # 03 Y:2005 03 2005 USE EVAPORATION TO CONCENTRATE MATERIAL $7,975 $3,000 Implemented
LM0088 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,349 $0 Not Implemented
LM0088 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $82 $126 Not Implemented
OR0477 # 01 Y:2005 01 2005 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $240,000 $250,000 Not Implemented
OR0477 # 02 Y:2005 02 2005 OPTIMIZE PLANT POWER FACTOR $34,000 $34,000 Not Implemented
OR0477 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $28,455 $11,500 Implemented
OR0477 # 04 Y:2005 04 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,900 $3,100 Implemented
OR0477 # 05 Y:2005 05 2005 MODIFY MATERIAL APPLICATION METHODS $14,995 $1,875 Implemented
OR0477 # 06 Y:2005 06 2005 RECOVER AND REUSE WASTE MATERIAL $13,416 $25,000 Implemented
OR0477 # 07 Y:2005 07 2005 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $29,545 $182,000 Not Implemented
OR0477 # 08 Y:2005 08 2005 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $48,200 $0 Implemented
OR0477 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,870 $84,875 Not Implemented
OR0476 # 01 Y:2005 01 2005 INSTALL SENSORS TO DETECT DEFECTS $59,097 $38,400 Not Implemented
OR0476 # 02 Y:2005 02 2005 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,039,000 $1,200,000 Not Implemented
OR0476 # 03 Y:2005 03 2005 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $9,028 $600 Implemented
OR0476 # 04 Y:2005 04 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $32,100 $47,900 Not Implemented
LE0203 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $34,823 $36,750 Implemented
LE0203 # 02 Y:2005 02 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,610 $3,000 Not Implemented