Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0299 # 08 Y:2005 | 08 | 2005 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,408 | $8,000 | Not Implemented |
OR0478 # 01 Y:2005 | 01 | 2005 | OPTIMIZE PLANT POWER FACTOR | $11,420 | $6,400 | Implemented |
OR0478 # 02 Y:2005 | 02 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,500 | $1,900 | Implemented |
OR0478 # 03 Y:2005 | 03 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,700 | $49,100 | Implemented |
OR0478 # 04 Y:2005 | 04 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $3,800 | $0 | Not Implemented |
LM0088 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,003 | $300 | Not Implemented |
LM0088 # 02 Y:2005 | 02 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $991 | $250 | Not Implemented |
LM0088 # 03 Y:2005 | 03 | 2005 | USE EVAPORATION TO CONCENTRATE MATERIAL | $7,975 | $3,000 | Implemented |
LM0088 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,349 | $0 | Not Implemented |
LM0088 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $82 | $126 | Not Implemented |
OR0477 # 01 Y:2005 | 01 | 2005 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $240,000 | $250,000 | Not Implemented |
OR0477 # 02 Y:2005 | 02 | 2005 | OPTIMIZE PLANT POWER FACTOR | $34,000 | $34,000 | Not Implemented |
OR0477 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $28,455 | $11,500 | Implemented |
OR0477 # 04 Y:2005 | 04 | 2005 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $18,900 | $3,100 | Implemented |
OR0477 # 05 Y:2005 | 05 | 2005 | MODIFY MATERIAL APPLICATION METHODS | $14,995 | $1,875 | Implemented |
OR0477 # 06 Y:2005 | 06 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $13,416 | $25,000 | Implemented |
OR0477 # 07 Y:2005 | 07 | 2005 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $29,545 | $182,000 | Not Implemented |
OR0477 # 08 Y:2005 | 08 | 2005 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $48,200 | $0 | Implemented |
OR0477 # 09 Y:2005 | 09 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,870 | $84,875 | Not Implemented |
OR0476 # 01 Y:2005 | 01 | 2005 | INSTALL SENSORS TO DETECT DEFECTS | $59,097 | $38,400 | Not Implemented |
OR0476 # 02 Y:2005 | 02 | 2005 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,039,000 | $1,200,000 | Not Implemented |
OR0476 # 03 Y:2005 | 03 | 2005 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $9,028 | $600 | Implemented |
OR0476 # 04 Y:2005 | 04 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $32,100 | $47,900 | Not Implemented |
LE0203 # 01 Y:2005 | 01 | 2005 | INSULATE BARE EQUIPMENT | $34,823 | $36,750 | Implemented |
LE0203 # 02 Y:2005 | 02 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,610 | $3,000 | Not Implemented |