Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0241 # 05 Y:1998 | 05 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,877 | $500 | Implemented |
ME0241 # 06 Y:1998 | 06 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $444 | $804 | Implemented |
ME0241 # 07 Y:1998 | 07 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $214 | $250 | Implemented |
ME0241 # 08 Y:1998 | 08 | 1998 | RECOVER AND REUSE COOLING WATER | $47,833 | $131,000 | Not Implemented |
ME0241 # 09 Y:1998 | 09 | 1998 | MINIMIZE WATER USAGE | $2,419 | $8,000 | Not Implemented |
ME0241 # 10 Y:1998 | 10 | 1998 | USE MINIMUM COOLING WATER TO BEARINGS | $2,321 | $4,200 | Not Implemented |
TN0629 # 01 Y:1998 | 01 | 1998 | REDUCE SCRAP PRODUCTION | $62,560 | $5,700 | Implemented |
TN0629 # 02 Y:1998 | 02 | 1998 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $35,290 | $98,000 | Not Implemented |
TN0629 # 03 Y:1998 | 03 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $24,360 | $9,800 | Not Implemented |
TN0629 # 04 Y:1998 | 04 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $21,285 | $25,800 | Implemented |
TN0629 # 05 Y:1998 | 05 | 1998 | MINIMIZE WATER USAGE | $16,270 | $0 | Not Implemented |
TN0629 # 06 Y:1998 | 06 | 1998 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $9,370 | $10,185 | Not Implemented |
TN0629 # 07 Y:1998 | 07 | 1998 | REDESIGN PROCESS | $2,675 | $1,100 | Implemented |
TN0629 # 08 Y:1998 | 08 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,370 | $1,800 | Not Implemented |
TN0629 # 09 Y:1998 | 09 | 1998 | METER WASTE WATER | $1,210 | $2,980 | Implemented |
WI0319 # 01 Y:1998 | 01 | 1998 | INSTALL SENSORS TO DETECT DEFECTS | $69,212 | $63,760 | Not Implemented |
WI0319 # 02 Y:1998 | 02 | 1998 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $6,046 | $13,200 | Not Implemented |
WI0319 # 03 Y:1998 | 03 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $4,599 | $18,400 | Not Implemented |
WI0319 # 04 Y:1998 | 04 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,295 | $940 | Not Implemented |
WI0319 # 05 Y:1998 | 05 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,187 | $500 | Not Implemented |
WI0319 # 06 Y:1998 | 06 | 1998 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $214 | $0 | Implemented |
AS0222 # 01 Y:1998 | 01 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,249 | $280 | Implemented |
AS0222 # 02 Y:1998 | 02 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,087 | $3,745 | Not Implemented |
AS0222 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,243 | $120 | Implemented |
AS0222 # 04 Y:1998 | 04 | 1998 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,365 | $60 | Implemented |