IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0216 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $99,648 $111,600 Not Implemented
SD0216 # 04 Y:1999 04 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $840 $0 Implemented
SD0216 # 05 Y:1999 05 1999 USE EVAPORATION TO CONCENTRATE MATERIAL $1,038 $1,500 Not Implemented
SD0216 # 06 Y:1999 06 1999 CONVERT TO AQUEOUS CLEANING $6,009 $6,009 Not Implemented
SD0216 # 07 Y:1999 07 1999 AUTOMATE FINISHING PROCESS $11,740 $4,100 Not Implemented
SD0216 # 08 Y:1999 08 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $25,245 $22,970 Not Implemented
SF0162 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $0 Implemented
SF0162 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,561 $2,700 Implemented
SF0162 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $453 $291 Implemented
SF0162 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,921 $3,189 Implemented
SF0162 # 05 Y:1999 05 1999 INSTALL OCCUPANCY SENSORS $1,105 $1,008 Not Implemented
SF0162 # 06 Y:1999 06 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,910 $8,190 Implemented
SF0162 # 07 Y:1999 07 1999 USE PHOTOCELL CONTROLS $2,025 $6,000 Not Implemented
SF0162 # 08 Y:1999 08 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,014 $4,121 Implemented
OR0339 # 01 Y:1999 01 1999 MOVE PRODUCT USING MECHANICAL MEANS $5,106,400 $556,000 Not Implemented
OR0339 # 02 Y:1999 02 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,650 $24,750 Implemented
OR0339 # 03 Y:1999 03 1999 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,080 $13,800 Implemented
OR0339 # 04 Y:1999 04 1999 TURN OFF EQUIPMENT WHEN NOT IN USE $178 $0 Not Implemented
OR0339 # 05 Y:1999 05 1999 RECOVER WASTE HEAT FROM EQUIPMENT $730 $381 Not Implemented
OR0339 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $254 $1,000 Implemented
OR0339 # 07 Y:1999 07 1999 UPGRADE CONTROLS ON COMPRESSORS $1,508 $1,454 Implemented
OR0339 # 08 Y:1999 08 1999 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $467 $441 Not Implemented
AS0247 # 01 Y:1999 01 1999 INSTALL SKYLIGHTS $7,511 $13,983 Not Implemented
AS0247 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $498 $20 Implemented
AS0247 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $587 $1,275 Implemented