IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,907

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0296 # 13 Y:2024 13 2024 REPAIR OR REPLACE STEAM TRAPS $7,154 $1,011 Implemented
AM0902 # 01 Y:2024 01 2024 REDUCE FLUID FLOW RATES $1,882 $3,000 n/a
AM0902 # 02 Y:2024 02 2024 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $2,608 $2,000 n/a
AM0902 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $19,396 $343,249 n/a
DL0235 # 01 Y:2024 01 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $719 $0 Implemented
DL0235 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $751 $800 Not Implemented
DL0235 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,885 $500 Not Implemented
DL0235 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $24,674 $10,000 Implemented
DL0235 # 05 Y:2024 05 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $646 $3,000 Not Implemented
DL0235 # 06 Y:2024 06 2024 REDUCE VENTILATION AIR $1,085 $0 Not Implemented
DL0235 # 07 Y:2024 07 2024 ADJUST VENTS TO MINIMIZE ENERGY USE $814 $1,500 Not Implemented
WM0211 # 01 Y:2024 01 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $7,114 $700 Implemented
WM0211 # 02 Y:2024 02 2024 USE RADIANT HEATER FOR SPOT HEATING $5,517 $16,193 Not Implemented
WM0211 # 03 Y:2024 03 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,617 $9,500 Implemented
WM0211 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,148 $150 Implemented
WM0211 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $216 $345 Implemented
WM0211 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $110 $0 Not Implemented
UD1075 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,737 $952 Implemented
UD1075 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $829 $0 Implemented
UD1075 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,565 $2,238 Implemented
UD1075 # 04 Y:2024 04 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,038 $7,596 Implemented
UD1075 # 05 Y:2024 05 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $712 $0 Implemented
UD1075 # 06 Y:2024 06 2024 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $5,142 $25,000 Not Implemented
UD1075 # 07 Y:2024 07 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $712,662 $195,000 Implemented
IC0295 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,690 $3,413 Implemented