IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0277 # 05 Y:2005 05 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,482 $0 Implemented
BD0277 # 06 Y:2005 06 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,301 $800 Implemented
BD0277 # 07 Y:2005 07 2005 SHUT OFF PILOTS IN STANDBY EQUIPMENT $736 $0 Implemented
BD0277 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $426 $297 Implemented
BD0277 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $395 $525 Implemented
BD0277 # 10 Y:2005 10 2005 AUTOMATE PAYROLL SYSTEM $4,368 $2,500 Not Implemented
BD0277 # 11 Y:2005 11 2005 CHANGE OPERATING CONDITIONS $1,882 $0 Implemented
LM0087 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,069 $17,418 Implemented
LM0087 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,466 $760 Implemented
LM0087 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,413 $0 Not Implemented
LM0087 # 04 Y:2005 04 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,685 $450 Not Implemented
LM0087 # 05 Y:2005 05 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $244 $377 Implemented
LM0087 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,321 $1,000 Implemented
LM0087 # 07 Y:2005 07 2005 MODIFY WORKLOAD $23,000 $9,700 Not Implemented
LM0087 # 08 Y:2005 08 2005 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $19,500 $3,680 Implemented
MI0097 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $3,490 $2,100 Not Implemented
MI0097 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $59,412 $800 Not Implemented
MI0097 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,212 $52,535 Not Implemented
MI0097 # 04 Y:2005 04 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,883 $30 Not Implemented
MI0097 # 05 Y:2005 05 2005 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,188 $7,077 Not Implemented
MI0097 # 06 Y:2005 06 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $28,209 $71,500 Not Implemented
SF0298 # 01 Y:2005 01 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $522 $0 Not Implemented
SF0298 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,943 $1,085 Not Implemented
SF0298 # 03 Y:2005 03 2005 INSTALL OCCUPANCY SENSORS $3,803 $2,432 Not Implemented
SF0298 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $61,229 $55,977 Not Implemented