IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,636

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0382 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,473 $142 Implemented
MS0382 # 03 Y:2011 03 2011 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $14,805 $0 Implemented
MS0382 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,932 $480 Implemented
MS0382 # 05 Y:2011 05 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,936 $1,056 Not Implemented
MS0382 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,709 $17,527 Implemented
MS0381 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $293 Implemented
MS0381 # 02 Y:2011 02 2011 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $31,659 $34,108 Not Implemented
MS0381 # 03 Y:2011 03 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $264 $317 Not Implemented
MS0381 # 04 Y:2011 04 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $14,709 $57,080 Not Implemented
MS0381 # 05 Y:2011 05 2011 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,990 $12,600 Implemented
MS0381 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,037 $8,580 Implemented
MS0380 # 01 Y:2011 01 2011 REPAIR AND ELIMINATE STEAM LEAKS $19,820 $561 Not Implemented
MS0380 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $123,143 $194,049 Not Implemented
MS0380 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $81,959 $85,986 Not Implemented
MS0380 # 04 Y:2011 04 2011 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $8,239 $4,272 Not Implemented
MS0380 # 05 Y:2011 05 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $30,363 $7,080 Not Implemented
MS0380 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,944 $466 Not Implemented
MS0379 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $1,001 $3,105 Not Implemented
MS0379 # 02 Y:2011 02 2011 BURN WOOD BY-PRODUCTS FOR HEAT $2,574 $5,626 Not Implemented
MS0378 # 01 Y:2011 01 2011 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $23,582 $178,700 Not Implemented
MS0378 # 02 Y:2011 02 2011 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $14,148 $132,820 Not Implemented
MS0376 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,895 $53,390 Implemented
MS0376 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,694 $516 Implemented
MS0376 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,815 $9,337 Implemented
MS0376 # 04 Y:2011 04 2011 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,513 $1,725 Not Implemented