IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0601 # 06 Y:1996 06 1996 USE LESS WASTEFUL PACKAGING $21,600 $45,000 Implemented
AM0285 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $49,000 $70,000 Implemented
AM0285 # 02 Y:1996 02 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $30,300 $47,880 Not Implemented
AM0285 # 03 Y:1996 03 1996 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,830 $5,660 Implemented
AM0285 # 04 Y:1996 04 1996 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $465 $0 Not Implemented
AM0285 # 05 Y:1996 05 1996 RECOVER AND REUSE WASTE MATERIAL $340 $0 Not Implemented
AR0103 # 01 Y:1996 01 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,369 $20 Implemented
AR0103 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,617 $450 Implemented
AR0103 # 03 Y:1996 03 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,695 $5,860 Implemented
AR0103 # 04 Y:1996 04 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $386 $0 Implemented
AR0103 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $872 $624 Not Implemented
AR0103 # 06 Y:1996 06 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,326 $2,326 Not Implemented
AR0103 # 07 Y:1996 07 1996 MAINTAIN MACHINES TO REDUCE LEAKS $900 $300 Implemented
OK0511 # 01 Y:1996 01 1996 USE RADIANT HEATER FOR SPOT HEATING $3,504 $18,090 Not Implemented
OK0511 # 02 Y:1996 02 1996 INSTALL TIMERS AND/OR THERMOSTATS $113 $124 Implemented
OK0511 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,844 $260 Implemented
OK0511 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,173 $797 Implemented
OK0511 # 05 Y:1996 05 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,723 $15,008 Implemented
NV0071 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,634 $200 Implemented
NV0071 # 02 Y:1996 02 1996 INSTALL OCCUPANCY SENSORS $1,257 $227 Not Implemented
NV0071 # 03 Y:1996 03 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,001 $250 Implemented
NV0071 # 04 Y:1996 04 1996 INSULATE BARE EQUIPMENT $7,692 $5,668 Implemented
NV0071 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,337 $3,292 Implemented
NV0071 # 06 Y:1996 06 1996 IMPROVE PROCESS CONTROL TO PREVENT SPILLS OF MATERIAL $1,029 $260 Not Implemented
OD0074 # 01 Y:1996 01 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,986 $800 n/a