IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0769 # 13 Y:2007 13 2007 UPGRADE CONTROLS ON COMPRESSORS $3,980 $0 Implemented
UD0769 # 14 Y:2007 14 2007 REDUCE VENTILATION AIR $2,208 $590 Implemented
UD0769 # 15 Y:2007 15 2007 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,800 $500 Implemented
UD0769 # 16 Y:2007 16 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,447 $520 Implemented
UD0769 # 17 Y:2007 17 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $1,242 $0 Implemented
MZ0016 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,548 $2,135 Not Implemented
MZ0016 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,880 $1,120 Implemented
MZ0016 # 03 Y:2007 03 2007 PREHEAT COMBUSTION AIR WITH WASTE HEAT $4,312 $3,000 Not Implemented
UM0329 # 01 Y:2007 01 2007 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $154,115 $300,000 Not Implemented
UM0329 # 02 Y:2007 02 2007 COVER OPEN TANKS $115,389 $140,000 Implemented
UM0329 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $74,880 $39,375 Implemented
UM0329 # 04 Y:2007 04 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,784 $265,000 Not Implemented
UM0329 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,455 $6,300 Implemented
GT0843 # 01 Y:2007 01 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,540 $2,000 Not Implemented
GT0843 # 02 Y:2007 02 2007 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,900 $0 Not Implemented
GT0843 # 03 Y:2007 03 2007 USE SYNTHETIC LUBRICANT $4,810 $0 Not Implemented
GT0843 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,720 $0 Not Implemented
GT0843 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $903 $2,882 Not Implemented
GT0843 # 06 Y:2007 06 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,752 $24,975 Not Implemented
UA0011 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $67,624 $122,055 Implemented
UA0011 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $45,713 $91,928 Not Implemented
UA0011 # 03 Y:2007 03 2007 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $11,081 $0 Implemented
UA0011 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,894 $700 Implemented
UA0011 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,753 $0 Not Implemented
UA0011 # 06 Y:2007 06 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,493 $2,877 Not Implemented