IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0082 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,313 $13,803 Not Implemented
MI0082 # 06 Y:2004 06 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,241 $610 Not Implemented
MI0082 # 07 Y:2004 07 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,594 $40 Not Implemented
UF0344 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,466 $60,000 Not Implemented
UF0344 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $11,821 $0 Not Implemented
UF0344 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,950 $490 Implemented
UF0344 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,898 $0 Not Implemented
UF0344 # 05 Y:2004 05 2004 USE PHOTOCELL CONTROLS $1,795 $6,164 Not Implemented
UF0344 # 06 Y:2004 06 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,470 $150 Not Implemented
UF0344 # 07 Y:2004 07 2004 METER WASTE WATER $2,616 $1,500 Not Implemented
MI0081 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,276 $600 Not Implemented
MI0081 # 02 Y:2004 02 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,092 $3,064 Not Implemented
MI0081 # 03 Y:2004 03 2004 INSULATE BARE EQUIPMENT $11,977 $1,982 Not Implemented
MI0081 # 04 Y:2004 04 2004 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $21,570 $30,000 Not Implemented
MI0081 # 05 Y:2004 05 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,291 $360 Not Implemented
MI0081 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,474 $590 Not Implemented
MI0080 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $9,571 $10,600 Not Implemented
MI0080 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $7,438 $2,300 Implemented
MI0080 # 03 Y:2004 03 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $93,161 $57,760 Not Implemented
MI0080 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,222 $160 Implemented
MI0080 # 05 Y:2004 05 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $822 $60 Implemented
MI0079 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,521 $600 Not Implemented
MI0079 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $7,957 $1,649 Not Implemented
MI0079 # 03 Y:2004 03 2004 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $108,501 $33,050 Not Implemented
MI0079 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,693 $250 Not Implemented