IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0512 # 10 Y:1999 10 1999 CONVERT TO ELECTROSTATIC POWDER COATING $278,220 $513,480 Not Implemented
KU0512 # 11 Y:1999 11 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $800,000 $29,240 Not Implemented
KU0512 # 12 Y:1999 12 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $220,990 $233,750 Not Implemented
TN0655 # 01 Y:1999 01 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $93,920 $120,140 Not Implemented
TN0655 # 02 Y:1999 02 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,480 $1,000 Not Implemented
TN0655 # 03 Y:1999 03 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,135 $5,115 Implemented
TN0655 # 04 Y:1999 04 1999 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $78,240 $6,600 Implemented
TN0655 # 05 Y:1999 05 1999 IMPROVE LUBRICATION PRACTICES $48,250 $111,600 Not Implemented
TN0655 # 06 Y:1999 06 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $112,500 $60,000 Not Implemented
WV0161 # 01 Y:1999 01 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $199 $250 Not Implemented
WV0161 # 02 Y:1999 02 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $619 $160 Implemented
WV0161 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,368 $15 Implemented
WV0161 # 04 Y:1999 04 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,060 $15 Implemented
WV0161 # 05 Y:1999 05 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $486 $100 Implemented
WV0161 # 06 Y:1999 06 1999 RECOVER WASTE HEAT FROM EQUIPMENT $2,728 $740 Not Implemented
WV0161 # 07 Y:1999 07 1999 PREHEAT COMBUSTION AIR WITH WASTE HEAT $5,666 $4,400 Not Implemented
WV0161 # 08 Y:1999 08 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $730 $1,826 Not Implemented
WV0161 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $610 $608 Not Implemented
WV0161 # 10 Y:1999 10 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $1,824 $11,000 Not Implemented
WV0161 # 11 Y:1999 11 1999 CONTRACT A WOOD PALLET RECYCLING COMPANY $720 $200 Not Implemented
WV0161 # 12 Y:1999 12 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $393 $0 Implemented
WV0161 # 13 Y:1999 13 1999 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $104,000 $32,500 Implemented
HO0199 # 01 Y:1999 01 1999 INSTALL OCCUPANCY SENSORS $450 $1,200 Not Implemented
HO0199 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,100 $0 Implemented
HO0199 # 03 Y:1999 03 1999 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,627 $1,300 Implemented