Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0342 # 01 Y:2004 01 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,371 $96,020 Not Implemented
UF0342 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $21,672 $30,000 Not Implemented
UF0342 # 03 Y:2004 03 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $12,326 $49,000 Not Implemented
UF0342 # 04 Y:2004 04 2004 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,850 $32,428 Not Implemented
UF0342 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,576 $5,393 Not Implemented
UF0342 # 06 Y:2004 06 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,148 $0 Implemented
UF0342 # 07 Y:2004 07 2004 ADD AREA LIGHTING SWITCHES $1,420 $8,148 Not Implemented
MI0077 # 01 Y:2004 01 2004 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,105 $600 Not Implemented
MI0077 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $5,344 $100 Implemented
MI0077 # 03 Y:2004 03 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $10,968 $5,200 Implemented
MI0077 # 04 Y:2004 04 2004 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $338 $354 Not Implemented
MI0077 # 05 Y:2004 05 2004 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,213 $1,200 Implemented
MI0077 # 06 Y:2004 06 2004 CONDENSE OPERATION INTO ONE BUILDING $44,015 $3,220 Implemented
MI0077 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $133 $125 Not Implemented
MI0077 # 08 Y:2004 08 2004 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,368 $1,635 Not Implemented
UF0340 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $122,549 $170,000 Not Implemented
UF0340 # 02 Y:2004 02 2004 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $617,545 $2,420,000 Not Implemented
UF0340 # 03 Y:2004 03 2004 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $29,744 $98,000 Not Implemented
UF0340 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,590 $48,289 Implemented
UF0340 # 05 Y:2004 05 2004 OPTIMIZE PLANT POWER FACTOR $10,480 $40,000 Implemented
UF0340 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,682 $400 Implemented
UF0340 # 07 Y:2004 07 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,109 $37,572 Not Implemented
UF0340 # 08 Y:2004 08 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,678 $7,900 Implemented
UF0341 # 01 Y:2004 01 2004 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $11,891 $44,888 Not Implemented
UF0341 # 02 Y:2004 02 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,921 $4,090 Implemented