IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0387 # 09 Y:2001 09 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $630 $640 Implemented
WI0387 # 10 Y:2001 10 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $90 Implemented
SD0261 # 01 Y:2001 01 2001 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $4,061 $10,250 Not Implemented
SD0261 # 02 Y:2001 02 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,459 $4,000 Not Implemented
SD0261 # 03 Y:2001 03 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,320 $0 Implemented
SD0261 # 04 Y:2001 04 2001 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $2,492 $0 Implemented
SD0261 # 05 Y:2001 05 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,500 $7,900 Not Implemented
SD0261 # 06 Y:2001 06 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,850 $2,100 Not Implemented
SD0261 # 07 Y:2001 07 2001 COVER CONTAINERS TO MINIMIZE EVAPORATIVE LOSSES $8,708 $15,000 Not Implemented
SD0261 # 08 Y:2001 08 2001 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $59,514 $0 Implemented
SD0261 # 09 Y:2001 09 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $14,400 $25,000 Not Implemented
SD0261 # 10 Y:2001 10 2001 PAY BILLS ON TIME TO AVOID LATE FEES $1,058 $0 Implemented
SF0207 # 01 Y:2001 01 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $348 $0 Implemented
SF0207 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $652 $720 Implemented
SF0207 # 03 Y:2001 03 2001 MODERATE COOLING TOWER OUTLET TEMPERATURE $395 $495 Implemented
SF0207 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $2,858 $4,793 Not Implemented
SF0207 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,032 $5,880 Not Implemented
SF0207 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $496 $1,308 Implemented
SF0207 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,435 $13,442 Not Implemented
SF0207 # 08 Y:2001 08 2001 RECOVER AND REUSE WASTE MATERIAL $576 $0 Not Implemented
SF0207 # 09 Y:2001 09 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,189 $19,300 Not Implemented
SF0207 # 10 Y:2001 10 2001 COMBINE UTILITY METERS $900 $1,900 Not Implemented
AM0384 # 01 Y:2001 01 2001 OPTIMIZE PLANT POWER FACTOR $8,525 $12,000 Implemented
AM0384 # 02 Y:2001 02 2001 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $6,630 $8,810 Implemented
AM0384 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,900 $250 Implemented