IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,403

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0169 # 06 Y:1996 06 1996 RECOVER AND REUSE WASTE MATERIAL $29,521 $90,000 Not Implemented
UF0147 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,558 $334 Implemented
UF0147 # 02 Y:1996 02 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $578 $0 Implemented
UF0147 # 03 Y:1996 03 1996 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,865 $2,300 Implemented
UF0147 # 04 Y:1996 04 1996 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,820 $450 Not Implemented
UF0147 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $496 $500 Implemented
UF0147 # 06 Y:1996 06 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,681 $8,000 Not Implemented
UF0147 # 07 Y:1996 07 1996 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,994 $0 Implemented
WV0089 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $988 $230 Implemented
WV0089 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $527 $280 Implemented
WV0089 # 03 Y:1996 03 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $441 Not Implemented
WV0089 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,555 $400 Implemented
WV0089 # 05 Y:1996 05 1996 INSULATE BARE EQUIPMENT $167 $36 Implemented
WV0089 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $399 $478 Not Implemented
WV0089 # 07 Y:1996 07 1996 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,478 $2,800 Not Implemented
WV0089 # 08 Y:1996 08 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,810 $10,600 Not Implemented
WV0089 # 09 Y:1996 09 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,728 $0 Implemented
TN0581 # 01 Y:1996 01 1996 RECOVER AND REUSE WASTE MATERIAL $25,995 $6,250 Not Implemented
TN0581 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,270 $23,940 Not Implemented
TN0581 # 03 Y:1996 03 1996 INSTALL TIMERS AND/OR THERMOSTATS $2,790 $1,000 Not Implemented
TN0581 # 04 Y:1996 04 1996 USE MINIMUM STEAM OPERATING PRESSURE $2,360 $2,600 Not Implemented
TN0581 # 05 Y:1996 05 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,600 $0 Not Implemented
TN0581 # 06 Y:1996 06 1996 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $455 $0 Implemented
TN0580 # 01 Y:1996 01 1996 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $18,501 $38,600 Not Implemented
TN0580 # 02 Y:1996 02 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,167 $5,110 Implemented