Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0481 # 04 Y:2001 | 04 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,370 | $7,000 | Implemented |
MA0481 # 05 Y:2001 | 05 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $910 | $1,315 | Implemented |
MA0481 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,400 | $10,000 | Not Implemented |
MA0481 # 07 Y:2001 | 07 | 2001 | INSULATE FEEDWATER TANK | $375 | $1,000 | Implemented |
MA0481 # 08 Y:2001 | 08 | 2001 | INSULATE FEEDWATER TANK | $260 | $1,300 | Not Implemented |
BD0177 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,288 | $500 | Implemented |
BD0177 # 02 Y:2001 | 02 | 2001 | INSTALL OCCUPANCY SENSORS | $3,171 | $1,425 | Not Implemented |
BD0177 # 03 Y:2001 | 03 | 2001 | USE SYNTHETIC LUBRICANT | $2,294 | $500 | Not Implemented |
BD0177 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,988 | $0 | Not Implemented |
BD0177 # 05 Y:2001 | 05 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,694 | $3,090 | Not Implemented |
BD0177 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $726 | $500 | Not Implemented |
BD0177 # 07 Y:2001 | 07 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $31,899 | $40,000 | Not Implemented |
BD0177 # 08 Y:2001 | 08 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $27,022 | $30,000 | Not Implemented |
BD0177 # 09 Y:2001 | 09 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $3,497 | $10,000 | Not Implemented |
UM0177 # 01 Y:2001 | 01 | 2001 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,246 | $11,850 | Not Implemented |
UM0177 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,577 | $950 | Implemented |
UM0177 # 03 Y:2001 | 03 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,663 | $4,200 | Not Implemented |
UM0177 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,480 | $27,000 | Implemented |
UM0177 # 05 Y:2001 | 05 | 2001 | RECOVER METALS FROM CASTING SAND | $64,000 | $0 | Not Implemented |
UM0177 # 06 Y:2001 | 06 | 2001 | RECYCLE CASTING SAND | $48,000 | $0 | Implemented |
UM0177 # 07 Y:2001 | 07 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $14,000 | $0 | Implemented |
WI0386 # 01 Y:2001 | 01 | 2001 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $27,904 | $20,000 | Not Implemented |
WI0386 # 02 Y:2001 | 02 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $11,368 | $0 | Not Implemented |
WI0386 # 03 Y:2001 | 03 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,197 | $12,760 | Not Implemented |
WI0386 # 04 Y:2001 | 04 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,301 | $2,460 | Not Implemented |