IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0481 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,370 $7,000 Implemented
MA0481 # 05 Y:2001 05 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $1,315 Implemented
MA0481 # 06 Y:2001 06 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,400 $10,000 Not Implemented
MA0481 # 07 Y:2001 07 2001 INSULATE FEEDWATER TANK $375 $1,000 Implemented
MA0481 # 08 Y:2001 08 2001 INSULATE FEEDWATER TANK $260 $1,300 Not Implemented
BD0177 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,288 $500 Implemented
BD0177 # 02 Y:2001 02 2001 INSTALL OCCUPANCY SENSORS $3,171 $1,425 Not Implemented
BD0177 # 03 Y:2001 03 2001 USE SYNTHETIC LUBRICANT $2,294 $500 Not Implemented
BD0177 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,988 $0 Not Implemented
BD0177 # 05 Y:2001 05 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,694 $3,090 Not Implemented
BD0177 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $726 $500 Not Implemented
BD0177 # 07 Y:2001 07 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $31,899 $40,000 Not Implemented
BD0177 # 08 Y:2001 08 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $27,022 $30,000 Not Implemented
BD0177 # 09 Y:2001 09 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $3,497 $10,000 Not Implemented
UM0177 # 01 Y:2001 01 2001 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,246 $11,850 Not Implemented
UM0177 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,577 $950 Implemented
UM0177 # 03 Y:2001 03 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $12,663 $4,200 Not Implemented
UM0177 # 04 Y:2001 04 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,480 $27,000 Implemented
UM0177 # 05 Y:2001 05 2001 RECOVER METALS FROM CASTING SAND $64,000 $0 Not Implemented
UM0177 # 06 Y:2001 06 2001 RECYCLE CASTING SAND $48,000 $0 Implemented
UM0177 # 07 Y:2001 07 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $14,000 $0 Implemented
WI0386 # 01 Y:2001 01 2001 DISTILL CONTAMINATED SOLVENTS FOR REUSE $27,904 $20,000 Not Implemented
WI0386 # 02 Y:2001 02 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $11,368 $0 Not Implemented
WI0386 # 03 Y:2001 03 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,197 $12,760 Not Implemented
WI0386 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,301 $2,460 Not Implemented