Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,874
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LT8365 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $55,888 | $0 | n/a |
LT8365 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,434 | $216,000 | n/a |
LS0523 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $934 | $25 | Not Implemented |
LS0523 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,765 | $2,680 | Implemented |
LS0523 # 03 Y:2023 | 03 | 2023 | INSTALL OCCUPANCY SENSORS | $4,193 | $750 | Implemented |
LS0523 # 04 Y:2023 | 04 | 2023 | USE PHOTOCELL CONTROLS | $666 | $148 | Implemented |
LE0538 # 01 Y:2023 | 01 | 2023 | PAY UTILITY BILLS ON TIME | $3,047 | $0 | Implemented |
LE0538 # 02 Y:2023 | 02 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,656 | $1,200 | Not Implemented |
LE0538 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,256 | $2,500 | Implemented |
LE0538 # 04 Y:2023 | 04 | 2023 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $3,452 | $1,992 | Not Implemented |
LE0538 # 05 Y:2023 | 05 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,576 | $4,000 | Implemented |
LE0538 # 06 Y:2023 | 06 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,166 | $4,521 | Implemented |
LE0538 # 07 Y:2023 | 07 | 2023 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $49,716 | $58,635 | Not Implemented |
LE0538 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,366 | $2,000 | Implemented |
LE0538 # 09 Y:2023 | 09 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,125 | $18,761 | Not Implemented |
LE0538 # 10 Y:2023 | 10 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $459 | $1,341 | Not Implemented |
LE0538 # 11 Y:2023 | 11 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $14,629 | $46,896 | Not Implemented |
LS0423 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,341 | $0 | Not Implemented |
LS0423 # 02 Y:2023 | 02 | 2023 | INSTALL TIMERS AND/OR THERMOSTATS | $16,263 | $1,100 | Implemented |
LS0423 # 03 Y:2023 | 03 | 2023 | USE PHOTOCELL CONTROLS | $225 | $111 | Not Implemented |
LS0423 # 04 Y:2023 | 04 | 2023 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $325 | $189 | Not Implemented |
LS0423 # 05 Y:2023 | 05 | 2023 | INSTALL OCCUPANCY SENSORS | $1,678 | $1,350 | Implemented |
LS0423 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $207 | $220 | Not Implemented |
LS0423 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,246 | $5,876 | Implemented |
UU0211 # 01 Y:2023 | 01 | 2023 | REPLACE BOILER | $24,600 | $111,300 | Implemented |