IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0205 # 01 Y:1986 01 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $855 $643 Implemented
OK0205 # 02 Y:1986 02 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $670 $428 Implemented
OK0205 # 03 Y:1986 03 1986 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $3,130 $10,000 Not Implemented
OK0206 # 01 Y:1986 01 1986 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $1,270 $3,500 Implemented
OK0206 # 02 Y:1986 02 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,340 $1,056 Implemented
OK0206 # 03 Y:1986 03 1986 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $743 $4,000 Implemented
OK0207 # 01 Y:1986 01 1986 KEEP LAMPS AND REFLECTORS CLEAN $10,632 $24,429 Implemented
OK0207 # 02 Y:1986 02 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $153 $87 Implemented
OK0207 # 03 Y:1986 03 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24 $4 Implemented
OK0207 # 04 Y:1986 04 1986 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,124 $8,200 Implemented
OK0207 # 05 Y:1986 05 1986 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $2,466 $1,200 Implemented
OK0195 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,989 $500 Implemented
OK0195 # 02 Y:1986 02 1986 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $2,085 $214 Not Implemented
OK0195 # 03 Y:1986 03 1986 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,520 $3,000 Implemented
OK0195 # 04 Y:1986 04 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,902 $0 Implemented
OK0195 # 05 Y:1986 05 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,289 $1,200 Implemented
OK0195 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $582 $0 Implemented
OK0195 # 07 Y:1986 07 1986 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $2,030 $1,200 Implemented
OK0196 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,521 $0 Implemented
OK0196 # 02 Y:1986 02 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $693 $1,821 Implemented
OK0196 # 03 Y:1986 03 1986 USE RADIANT HEATER FOR SPOT HEATING $7,663 $36,000 Not Implemented
OK0197 # 01 Y:1986 01 1986 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,964 $3,200 Implemented
OK0197 # 02 Y:1986 02 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $369 $360 Not Implemented
OK0197 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,954 $1,500 Not Implemented
OK0197 # 04 Y:1986 04 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $547 $80 Implemented