IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0341 # 05 Y:1999 05 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,991 $0 Not Implemented
WI0341 # 06 Y:1999 06 1999 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,824 $0 Not Implemented
WI0341 # 07 Y:1999 07 1999 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,647 $300 Implemented
WI0341 # 08 Y:1999 08 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,475 $0 Implemented
WV0159 # 01 Y:1999 01 1999 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $566 $512 Implemented
WV0159 # 02 Y:1999 02 1999 OPTIMIZE PLANT POWER FACTOR $18,085 $24,240 Not Implemented
WV0159 # 03 Y:1999 03 1999 BURN A LESS EXPENSIVE GRADE OF FUEL $60,045 $26,400 Not Implemented
WV0159 # 04 Y:1999 04 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,860 $3,870 Not Implemented
WV0159 # 05 Y:1999 05 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,760 $30 Implemented
WV0159 # 06 Y:1999 06 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $100 Implemented
WV0159 # 07 Y:1999 07 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,691 $4,100 Not Implemented
WV0159 # 08 Y:1999 08 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $448 $175 Implemented
WV0159 # 09 Y:1999 09 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,660 $55 Implemented
WV0159 # 10 Y:1999 10 1999 RECOVER AND REUSE WASTE MATERIAL $18,805 $50 Not Implemented
WV0159 # 11 Y:1999 11 1999 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $108,645 $100,000 Implemented
UD0564 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $220,632 $300,000 Not Implemented
UD0564 # 02 Y:1999 02 1999 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,972 $148 Implemented
UD0564 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $22,776 $49,660 Not Implemented
UD0564 # 04 Y:1999 04 1999 COVER OPEN TANKS $13,847 $2,400 Implemented
UD0564 # 05 Y:1999 05 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $10,689 $0 Implemented
UD0564 # 06 Y:1999 06 1999 METER WASTE WATER $5,686 $2,200 Not Implemented
UD0564 # 07 Y:1999 07 1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,767 $3,375 Implemented
UD0564 # 08 Y:1999 08 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,156 $5,096 Not Implemented
UD0564 # 09 Y:1999 09 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $218 $684 Not Implemented
NC0158 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $384 $120 Implemented