IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50,291

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0591 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $920,649 $25,909 Implemented
OR0591 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $93,821 $27,749 Not Implemented
OR0591 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,274 $6,968 Implemented
OR0587 # 04 Y:2012 04 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $3,099 $1,560 Not Implemented
OR0587 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $2,854 $2,854 Implemented
OR0587 # 06 Y:2012 06 2012 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $7,810 $9,114 Not Implemented
OR0587 # 07 Y:2012 07 2012 Install Anaerobic Digester $75,601 $294,329 Not Implemented
OR0590 # 01 Y:2012 01 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $5,954 $5,038 Not Implemented
OR0590 # 02 Y:2012 02 2012 USE OPTIMUM TEMPERATURE $3,137 $0 Implemented
OR0590 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,188 $87,787 Not Implemented
OR0587 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $11,403 $11,403 Not Implemented
OR0587 # 02 Y:2012 02 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,687 $1,000 Not Implemented
OR0587 # 03 Y:2012 03 2012 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $15,142 $6,108 Not Implemented
MZ0097 # 01 Y:2012 01 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $230,479 $107,601 Not Implemented
MZ0097 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $106,168 $10,690 Not Implemented
MZ0097 # 03 Y:2012 03 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $60,715 $105,000 Not Implemented
MZ0097 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $49,961 $5,000 Not Implemented
MZ0097 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $29,305 $35,000 Implemented
MZ0097 # 06 Y:2012 06 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,968 $450 Implemented
MZ0097 # 07 Y:2012 07 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,420 $2,000 Not Implemented
DL0092 # 01 Y:2012 01 2012 REPAIR AND ELIMINATE STEAM LEAKS $50,827 $48,000 Not Implemented
DL0092 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,100 $25,000 Not Implemented
DL0092 # 03 Y:2012 03 2012 UPGRADE CONTROLS ON COMPRESSORS $12,700 $28,000 Not Implemented
WV0456 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $47,518 $95,285 Implemented
WV0456 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,893 $58,995 Implemented