IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0595 # 04 Y:2017 04 2017 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $3,516 $400 Implemented
NC0595 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $910 $2,000 Not Implemented
NC0594 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,372 $77,272 Implemented
NC0594 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $5,666 $2,982 Implemented
NC0594 # 03 Y:2017 03 2017 UPGRADE CONTROLS ON COMPRESSORS $5,016 $8,200 Implemented
NC0594 # 04 Y:2017 04 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,502 $1,000 Implemented
NC0594 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $979 $100 Implemented
NC0594 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,732 $50 Implemented
NC0594 # 07 Y:2017 07 2017 RECOVER WASTE HEAT FROM EQUIPMENT $2,917 $3,500 Not Implemented
NC0594 # 08 Y:2017 08 2017 RECOVER WASTE HEAT FROM EQUIPMENT $10,457 $20,000 Not Implemented
NC0594 # 09 Y:2017 09 2017 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $261 $200 Not Implemented
NC0593 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,891 $81,460 Implemented
NC0593 # 02 Y:2017 02 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,060 $1,000 Implemented
NC0593 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $941 $1,500 Implemented
NC0593 # 04 Y:2017 04 2017 USE PHOTOCELL CONTROLS $223 $100 Implemented
NC0593 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $428 $100 Implemented
NC0593 # 06 Y:2017 06 2017 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $119 $300 Not Implemented
NC0593 # 07 Y:2017 07 2017 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $1,986 $600 Implemented
NC0589 # 01 Y:2017 01 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $38,378 $62,575 Not Implemented
NC0589 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,080 $19,100 Not Implemented
NC0589 # 03 Y:2017 03 2017 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,455 $10,000 Not Implemented
NC0589 # 04 Y:2017 04 2017 IMPROVE SPACE COMFORT CONDITIONING $28,966 $135,750 Not Implemented
NC0589 # 05 Y:2017 05 2017 DISTILL CONTAMINATED SOLVENTS FOR REUSE $11,593 $10,750 Not Implemented
NC0589 # 06 Y:2017 06 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $3,876 $840 Implemented
NC0589 # 07 Y:2017 07 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,357 $1,000 Implemented