IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0175 # 06 Y:2004 06 2004 PREHEAT COMBUSTION AIR WITH WASTE HEAT $9,764 $8,647 Implemented
SU0175 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $468 Implemented
SU0175 # 08 Y:2004 08 2004 INSTALL SOLID WASTE INCINERATOR FOR HEAT $9,162 $8,765 Not Implemented
LE0181 # 01 Y:2004 01 2004 RECOVER AND REUSE WASTE MATERIAL $132,275 $20,000 Not Implemented
LE0181 # 02 Y:2004 02 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $37,431 $2,000 Implemented
LE0181 # 03 Y:2004 03 2004 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING $5,226 $10,000 Not Implemented
LE0181 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,768 $200 Implemented
LE0181 # 05 Y:2004 05 2004 TURN OFF EQUIPMENT WHEN NOT IN USE $3,160 $0 Not Implemented
LE0181 # 06 Y:2004 06 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,566 $0 Implemented
LE0181 # 07 Y:2004 07 2004 OPTIMIZE PLANT POWER FACTOR $860 $4,250 Not Implemented
LE0181 # 08 Y:2004 08 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $282 $0 Not Implemented
IA0336 # 01 Y:2004 01 2004 REDUCE EXCESSIVE BOILER BLOWDOWN $3,854 $4,300 Implemented
IA0336 # 02 Y:2004 02 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,930 $20,000 Implemented
IA0336 # 03 Y:2004 03 2004 REPLACE BOILER $27,684 $150,000 Implemented
IA0336 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $199 $80 Implemented
IA0336 # 05 Y:2004 05 2004 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $499 $400 Implemented
IA0336 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,139 $1,364 Implemented
IA0336 # 07 Y:2004 07 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,346 $1,197 Implemented
IA0336 # 08 Y:2004 08 2004 INSTALL OCCUPANCY SENSORS $906 $7,407 Not Implemented
IA0336 # 09 Y:2004 09 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,039 $7,405 Not Implemented
LE0179 # 01 Y:2004 01 2004 REDUCE VENTILATION AIR $10,362 $942 Not Implemented
LE0179 # 02 Y:2004 02 2004 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,781 $0 Implemented
LE0179 # 03 Y:2004 03 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,423 $89 Implemented
LE0179 # 04 Y:2004 04 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,185 $0 Not Implemented
LE0179 # 05 Y:2004 05 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $960 $750 Not Implemented