Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0244 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $16,388 | $120 | n/a |
AS0244 # 04 Y:1999 | 04 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $15,768 | $480 | n/a |
AS0244 # 05 Y:1999 | 05 | 1999 | PURCHASE EQUIPMENT INSTEAD OF LEASING | $14,400 | $50,000 | n/a |
AS0244 # 06 Y:1999 | 06 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $346,891 | $10,000 | n/a |
UM0134 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,206 | $1,000 | Not Implemented |
UM0134 # 02 Y:1999 | 02 | 1999 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $11,967 | $2,000 | Not Implemented |
UM0134 # 03 Y:1999 | 03 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $27,764 | $36,550 | Not Implemented |
UM0134 # 04 Y:1999 | 04 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,800 | $0 | Not Implemented |
UM0134 # 05 Y:1999 | 05 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $944,916 | $200,000 | Not Implemented |
SD0214 # 05 Y:1999 | 05 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $800 | $0 | Implemented |
SD0214 # 06 Y:1999 | 06 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,832 | $1,000 | Implemented |
SD0214 # 07 Y:1999 | 07 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $3,600 | $2,300 | Implemented |
SD0214 # 08 Y:1999 | 08 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $86,788 | $60,000 | Not Implemented |
SD0214 # 01 Y:1999 | 01 | 1999 | INSTALL SPECTRAL REFLECTORS / DELAMP | $6,221 | $5,880 | Not Implemented |
SD0214 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,699 | $10,196 | Implemented |
SD0214 # 03 Y:1999 | 03 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,874 | $1,100 | Not Implemented |
SD0214 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $38,175 | $12,000 | Not Implemented |
CO0432 # 01 Y:1999 | 01 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,030 | $150 | Implemented |
CO0432 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,610 | $1,400 | Not Implemented |
CO0432 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $380 | $50 | Not Implemented |
CO0432 # 04 Y:1999 | 04 | 1999 | USE LOW VOC OR WATER BASED PAINT | $10,460 | $5,000 | Not Implemented |
CO0432 # 05 Y:1999 | 05 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,230 | $2,500 | Not Implemented |
CO0432 # 06 Y:1999 | 06 | 1999 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $1,470 | $3,000 | Not Implemented |
ME0259 # 01 Y:1999 | 01 | 1999 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $7,332 | $5,655 | Implemented |
ME0259 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,027 | $9,340 | Implemented |