IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0244 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $16,388 $120 n/a
AS0244 # 04 Y:1999 04 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $15,768 $480 n/a
AS0244 # 05 Y:1999 05 1999 PURCHASE EQUIPMENT INSTEAD OF LEASING $14,400 $50,000 n/a
AS0244 # 06 Y:1999 06 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $346,891 $10,000 n/a
UM0134 # 01 Y:1999 01 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,206 $1,000 Not Implemented
UM0134 # 02 Y:1999 02 1999 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $11,967 $2,000 Not Implemented
UM0134 # 03 Y:1999 03 1999 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $27,764 $36,550 Not Implemented
UM0134 # 04 Y:1999 04 1999 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,800 $0 Not Implemented
UM0134 # 05 Y:1999 05 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $944,916 $200,000 Not Implemented
SD0214 # 05 Y:1999 05 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $800 $0 Implemented
SD0214 # 06 Y:1999 06 1999 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,832 $1,000 Implemented
SD0214 # 07 Y:1999 07 1999 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $3,600 $2,300 Implemented
SD0214 # 08 Y:1999 08 1999 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $86,788 $60,000 Not Implemented
SD0214 # 01 Y:1999 01 1999 INSTALL SPECTRAL REFLECTORS / DELAMP $6,221 $5,880 Not Implemented
SD0214 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,699 $10,196 Implemented
SD0214 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,874 $1,100 Not Implemented
SD0214 # 04 Y:1999 04 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $38,175 $12,000 Not Implemented
CO0432 # 01 Y:1999 01 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,030 $150 Implemented
CO0432 # 02 Y:1999 02 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,610 $1,400 Not Implemented
CO0432 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $380 $50 Not Implemented
CO0432 # 04 Y:1999 04 1999 USE LOW VOC OR WATER BASED PAINT $10,460 $5,000 Not Implemented
CO0432 # 05 Y:1999 05 1999 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,230 $2,500 Not Implemented
CO0432 # 06 Y:1999 06 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,470 $3,000 Not Implemented
ME0259 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,332 $5,655 Implemented
ME0259 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,027 $9,340 Implemented