IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0604 # 06 Y:1997 06 1997 USE SYNTHETIC LUBRICANT $432 $0 Implemented
WV0114 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $248 Implemented
WV0114 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,663 $11,400 Implemented
WV0114 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,379 $2,240 Implemented
WV0114 # 04 Y:1997 04 1997 USE SYNTHETIC LUBRICANT $422 $640 Not Implemented
WV0114 # 05 Y:1997 05 1997 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $10,136 $43,250 Not Implemented
WV0114 # 06 Y:1997 06 1997 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $900 $5,000 Not Implemented
WV0114 # 07 Y:1997 07 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,760 $590 Implemented
WV0114 # 08 Y:1997 08 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $426,660 $121,000 Not Implemented
OK0519 # 01 Y:1997 01 1997 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $178,301 $18,000 Implemented
OK0519 # 02 Y:1997 02 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,853 $15,000 Implemented
OK0519 # 03 Y:1997 03 1997 RECOVER WASTE HEAT FROM EQUIPMENT $4,927 $0 Implemented
OK0519 # 04 Y:1997 04 1997 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $14,177 $20,000 Implemented
OK0519 # 05 Y:1997 05 1997 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $0 $119,800 Not Implemented
OK0519 # 06 Y:1997 06 1997 USE OTHER METHODS FOR NEUTRALIZATION $11,000 $50,000 Implemented
OK0519 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $467 $880 Implemented
OK0519 # 08 Y:1997 08 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $115 $644 Implemented
MS0080 # 01 Y:1997 01 1997 USE PHOTOCELL CONTROLS $2,171 $698 Not Implemented
MS0080 # 02 Y:1997 02 1997 TURN OFF EQUIPMENT WHEN NOT IN USE $15,115 $0 Implemented
MS0080 # 03 Y:1997 03 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,984 $53 Implemented
MS0080 # 04 Y:1997 04 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $79,800 $6,490 Implemented
MS0080 # 05 Y:1997 05 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $15,120 $2,303 Not Implemented
AR0111 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,354 $240 Implemented
AR0111 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,078 $3,090 Implemented
AR0111 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $988 $0 Not Implemented