IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0166 # 08 Y:1997 08 1997 REPROCESS SPENT OILS ON SITE FOR RE-USE $491 $0 Not Implemented
SD0166 # 09 Y:1997 09 1997 $370,400 $53,750 Not Implemented
ME0212 # 01 Y:1997 01 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,180 $12,500 Implemented
ME0212 # 02 Y:1997 02 1997 COVER OPEN TANKS $6,034 $6,233 Not Implemented
ME0212 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,766 $13,215 Implemented
ME0212 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,098 $12,016 Implemented
ME0212 # 05 Y:1997 05 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,178 $1,632 Implemented
ME0212 # 06 Y:1997 06 1997 INSULATE BARE EQUIPMENT $1,570 $980 Implemented
ME0212 # 07 Y:1997 07 1997 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $849 $439 Implemented
ME0212 # 08 Y:1997 08 1997 REPAIR AND ELIMINATE STEAM LEAKS $8,286 $9,600 Not Implemented
ME0212 # 09 Y:1997 09 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,950 $5,000 Not Implemented
HO0149 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,800 $33,870 Not Implemented
HO0149 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $168 $358 Not Implemented
HO0149 # 03 Y:1997 03 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $367 $400 Not Implemented
HO0149 # 04 Y:1997 04 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $620 $444 Not Implemented
HO0149 # 05 Y:1997 05 1997 $8,160 $35,000 Not Implemented
HO0149 # 06 Y:1997 06 1997 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $968 $750 Not Implemented
HO0149 # 07 Y:1997 07 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $13,500 $0 Not Implemented
HO0149 # 08 Y:1997 08 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $400 $500 Not Implemented
AS0197 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,219 $0 Not Implemented
AS0197 # 02 Y:1997 02 1997 USE SYNTHETIC LUBRICANT $2,789 $1,625 Implemented
AS0197 # 03 Y:1997 03 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,704 $21,700 Implemented
AS0197 # 04 Y:1997 04 1997 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $4,699 $3,600 Not Implemented
AS0197 # 05 Y:1997 05 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $319 $0 Implemented
AS0197 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $779 $1,680 Implemented