Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,687
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1014 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,017 | $1,750 | Implemented |
OK1013 # 04 Y:2019 | 04 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,610 | $6,480 | Not Implemented |
OK1013 # 06 Y:2019 | 06 | 2019 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $4,999 | $4,520 | Implemented |
OK1013 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $60,608 | $35,153 | Implemented |
OK1013 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $14,945 | $0 | Not Implemented |
OK1013 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,284 | $4,982 | Implemented |
OK1013 # 05 Y:2019 | 05 | 2019 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $264,923 | $206,847 | Not Implemented |
TT0224 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,374 | $16,645 | Implemented |
TT0224 # 07 Y:2019 | 07 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $7,188 | $600 | Not Implemented |
TT0224 # 10 Y:2019 | 10 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $792 | $40 | Not Implemented |
TT0224 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,405 | $3,200 | Implemented |
TT0224 # 09 Y:2019 | 09 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,042 | $640 | Not Implemented |
TT0224 # 01 Y:2019 | 01 | 2019 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $119,892 | $51,560 | Implemented |
TT0224 # 08 Y:2019 | 08 | 2019 | USE OPTIMUM THICKNESS INSULATION | $3,722 | $10,752 | Implemented |
TT0224 # 06 Y:2019 | 06 | 2019 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $9,767 | $1,910 | Not Implemented |
TT0224 # 02 Y:2019 | 02 | 2019 | USE OPTIMUM THICKNESS INSULATION | $45,228 | $60,000 | Not Implemented |
TT0224 # 05 Y:2019 | 05 | 2019 | INSTALL TIMERS AND/OR THERMOSTATS | $14,353 | $500 | Implemented |
OK1002 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,768 | $3,646 | Implemented |
OK1002 # 07 Y:2019 | 07 | 2019 | USE RADIANT HEATER FOR SPOT HEATING | $39,703 | $37,000 | Not Implemented |
OK1002 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,400 | $2,933 | Implemented |
OK1002 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,343 | $2,609 | Implemented |
OK1002 # 06 Y:2019 | 06 | 2019 | INSTALL SET-BACK TIMERS | $1,083 | $802 | Implemented |
OK1002 # 05 Y:2019 | 05 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $191,600 | $806,420 | Not Implemented |
OK1002 # 01 Y:2019 | 01 | 2019 | OPTIMIZE PLANT POWER FACTOR | $20,293 | $28,306 | Not Implemented |
TT0204 # 09 Y:2018 | 09 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $402 | $0 | Implemented |