IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

104

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0355 # 11 Y:2004 11 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,521 $2 Implemented
IA0355 # 12 Y:2004 12 2004 INSTALL OCCUPANCY SENSORS $334 $616 Not Implemented
IA0355 # 06 Y:2004 06 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $540 $359 Implemented
IA0355 # 04 Y:2004 04 2004 REDUCE EXCESSIVE BOILER BLOWDOWN $8,646 $2 Implemented
IA0355 # 03 Y:2004 03 2004 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $12,422 $17 Implemented
IA0355 # 02 Y:2004 02 2004 USE MINIMUM STEAM OPERATING PRESSURE $965 $25 Not Implemented
IA0355 # 01 Y:2004 01 2004 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,113 $300 Implemented
IA0348 # 08 Y:2004 08 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,653 $4,596 Implemented
IA0348 # 07 Y:2004 07 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $383 $120 Not Implemented
IA0348 # 06 Y:2004 06 2004 DIRECT WARMEST AIR TO COMBUSTION INTAKE $193 $438 Not Implemented
IA0348 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,829 $14,216 Implemented
IA0348 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,888 $535 Implemented
IA0348 # 03 Y:2004 03 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $651 $146 Implemented
IA0348 # 02 Y:2004 02 2004 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,336 $475 Not Implemented
IA0348 # 01 Y:2004 01 2004 OPTIMIZE PLANT POWER FACTOR $9,818 $10,704 Implemented
IA0346 # 03 Y:2004 03 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,933 $5,520 Not Implemented
IA0346 # 05 Y:2004 05 2004 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $2,161 $2,400 Implemented
IA0346 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,882 $25,488 Not Implemented
IA0346 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $338 $665 Implemented
IA0346 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $736 $3,053 Implemented
IA0346 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $581 $20 Implemented
IA0346 # 04 Y:2004 04 2004 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,993 $6,000 Implemented
IA0346 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $375 $227 Implemented
IA0345 # 12 Y:2004 12 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $21,035 $20,180 Implemented
IA0345 # 13 Y:2004 13 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $30,870 $10,000 Implemented