Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,417
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0105 # 05 Y:1990 | 05 | 1990 | INSTALL SET-BACK TIMERS | $3,860 | $0 | Not Implemented |
OK0331 # 03 Y:1990 | 03 | 1990 | INSULATE BARE EQUIPMENT | $382 | $252 | Implemented |
KU0330 # 01 Y:1990 | 01 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,058 | $490 | Not Implemented |
MA0200 # 02 Y:1990 | 02 | 1990 | REPAIR OR REPLACE STEAM TRAPS | $4,450 | $2,880 | Implemented |
AM0105 # 08 Y:1990 | 08 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $180 | $170 | Implemented |
MA0199 # 06 Y:1990 | 06 | 1990 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,992 | $21,942 | Not Implemented |
AM0105 # 06 Y:1990 | 06 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,800 | $400 | Implemented |
AM0105 # 02 Y:1990 | 02 | 1990 | OPTIMIZE PLANT POWER FACTOR | $7,790 | $21,500 | Implemented |
KU0330 # 02 Y:1990 | 02 | 1990 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,368 | $3,600 | Not Implemented |
CO0200 # 07 Y:1990 | 07 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $540 | $1,800 | Not Implemented |
MA0200 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,023 | $15,974 | Implemented |
KU0330 # 03 Y:1990 | 03 | 1990 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,198 | $0 | Implemented |
CO0200 # 05 Y:1990 | 05 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $950 | $2,000 | Not Implemented |
OK0332 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $98 | $102 | Implemented |
AM0105 # 04 Y:1990 | 04 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,000 | $0 | Implemented |
CO0200 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,570 | $320 | Not Implemented |
AM0105 # 01 Y:1990 | 01 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,500 | $27,000 | Not Implemented |
OK0331 # 01 Y:1990 | 01 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,171 | $0 | Implemented |
MA0200 # 01 Y:1990 | 01 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $45,965 | $47,912 | Implemented |
OK0331 # 02 Y:1990 | 02 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,918 | $3,000 | Not Implemented |
MA0199 # 02 Y:1990 | 02 | 1990 | INSULATE FEEDWATER TANK | $1,053 | $352 | Implemented |
AM0105 # 03 Y:1990 | 03 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,600 | $500 | Implemented |
WI0105 # 11 Y:1990 | 11 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $213 | $0 | Implemented |
CO0200 # 01 Y:1990 | 01 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $4,200 | $2,250 | Not Implemented |
MA0199 # 03 Y:1990 | 03 | 1990 | INSULATE BARE EQUIPMENT | $147 | $118 | Not Implemented |