IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0423 # 07 Y:1998 07 1998 INSTALL OCCUPANCY SENSORS $149 $257 Not Implemented
MA0428 # 04 Y:1998 04 1998 IMPROVE SPACE COMFORT CONDITIONING $5,656 $11,874 Not Implemented
MA0428 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,142 $980 Implemented
MA0428 # 01 Y:1998 01 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,280 $2,110 Not Implemented
MA0428 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $642 $30 Implemented
MA0428 # 05 Y:1998 05 1998 ADOPT IN-HOUSE MATERIAL GENERATION $5,618 $29,750 Not Implemented
UL0211 # 01 Y:1998 01 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $11,780 $0 n/a
HO0175 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $320 $500 Not Implemented
HO0175 # 06 Y:1998 06 1998 CLEAR AND RENT EXISTING SPACE $18,000 $3,000 Implemented
HO0175 # 05 Y:1998 05 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $9,375 $0 Implemented
HO0175 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $800 $300 Implemented
HO0175 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,263 $16,755 Implemented
HO0175 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $3,201 $168 Implemented
UL0211 # 02 Y:1998 02 1998 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $6,350 $0 n/a
UL0211 # 03 Y:1998 03 1998 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $6,169 $15,000 n/a
MA0422 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,664 $120,000 Not Implemented
MA0422 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $776 Implemented
MA0422 # 02 Y:1998 02 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,889 $3,625 Not Implemented
MA0422 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $337 $346 Implemented
MA0422 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $764 $0 Implemented
MA0422 # 04 Y:1998 04 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $452 $1,270 Implemented
GT0656 # 01 Y:1998 01 1998 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $9,632 $7,000 Implemented
GT0656 # 02 Y:1998 02 1998 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $5,934 $4,000 Not Implemented
GT0656 # 03 Y:1998 03 1998 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,440 $0 Implemented
GT0656 # 06 Y:1998 06 1998 COMBINE UTILITY METERS $1,780 $0 Not Implemented