IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,443

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0529 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $373 $1,155 Implemented
IA0529 # 05 Y:2015 05 2015 INSTALL SPECTRAL REFLECTORS / DELAMP $569 $210 Implemented
IA0529 # 06 Y:2015 06 2015 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $1,950 $5,000 Implemented
IA0474 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,989 $668 Not Implemented
IA0474 # 02 Y:2011 02 2011 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,851 $5,045 Not Implemented
IA0474 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,183 $11,760 Not Implemented
IA0473 # 01 Y:2011 01 2011 RECOVER WASTE HEAT FROM EQUIPMENT $695 $1,100 Not Implemented
IA0473 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,500 $105 Implemented
IA0473 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,238 $4,669 Implemented
IA0473 # 04 Y:2011 04 2011 INSTALL OCCUPANCY SENSORS $1,472 $426 Not Implemented
IA0473 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $615 $1,273 Implemented
IA0473 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $468 $954 Not Implemented
IA0465 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,456 $246 Not Implemented
IA0465 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,745 $396 Not Implemented
IA0465 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,614 $7,406 Not Implemented
IA0465 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,910 $60,314 Not Implemented
IA0465 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $1,368 $616 Not Implemented
IA0465 # 06 Y:2011 06 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $302 $13 Not Implemented
IA0465 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,240 $8,646 Not Implemented
IA0465 # 08 Y:2011 08 2011 USE RADIANT HEATER FOR SPOT HEATING $20,214 $48,000 Not Implemented
IA0464 # 01 Y:2011 01 2011 REPAIR AND ELIMINATE STEAM LEAKS $1,766 $700 Implemented
IA0464 # 02 Y:2011 02 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $387 $290 Implemented
IA0464 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $380 $15 Implemented
IA0464 # 04 Y:2011 04 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,199 $45 Implemented
IA0464 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,295 $10,281 Implemented