Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,599
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0698 # 01 Y:2018 | 01 | 2018 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $32,214 | $597 | Not Implemented |
OR0698 # 02 Y:2018 | 02 | 2018 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $18,374 | $9,440 | Implemented |
OR0698 # 03 Y:2018 | 03 | 2018 | USE HEAT PUMP FOR SPACE CONDITIONING | $12,461 | $22,850 | Implemented |
OR0698 # 04 Y:2018 | 04 | 2018 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,148 | $325 | Implemented |
OR0697 # 01 Y:2018 | 01 | 2018 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $201,762 | $50,000 | Implemented |
OR0697 # 02 Y:2018 | 02 | 2018 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $18,460 | $45,600 | Not Implemented |
OR0697 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $25,653 | $51,599 | Implemented |
OR0697 # 04 Y:2018 | 04 | 2018 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,381 | $19,381 | Not Implemented |
OR0697 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,725 | $250 | Implemented |
OR0696 # 01 Y:2017 | 01 | 2017 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $179,573 | $3,044 | Not Implemented |
OR0696 # 02 Y:2017 | 02 | 2017 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $79,265 | $37,275 | Not Implemented |
OR0696 # 03 Y:2017 | 03 | 2017 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $2,365 | $5,880 | Not Implemented |
OR0696 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,910 | $10,116 | Not Implemented |
OR0695 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,343 | $10,981 | Not Implemented |
OR0695 # 02 Y:2017 | 02 | 2017 | USE COLD WASTE WATER TO COOL CHILLER FEED WATER | $13,796 | $30,600 | Not Implemented |
OR0695 # 03 Y:2017 | 03 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,279 | $43,386 | Implemented |
OR0694 # 01 Y:2017 | 01 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $190,250 | $7,842 | Not Implemented |
OR0694 # 02 Y:2017 | 02 | 2017 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $78,503 | $7,018 | Not Implemented |
OR0694 # 03 Y:2017 | 03 | 2017 | INSTALL BACK-UP EQUIPMENT | $219,130 | $45,000 | Not Implemented |
OR0694 # 04 Y:2017 | 04 | 2017 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $29,962 | $12,100 | Not Implemented |
OR0694 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,605 | $10,606 | Not Implemented |
OR0694 # 06 Y:2017 | 06 | 2017 | MINIMIZE WATER USAGE | $8,079 | $15,125 | Not Implemented |
BS0108 # 01 Y:2017 | 01 | 2017 | OPTIMIZE PLANT POWER FACTOR | $6,587 | $25,166 | Not Implemented |
BS0108 # 02 Y:2017 | 02 | 2017 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $3,658 | $290 | Not Implemented |
BS0108 # 03 Y:2017 | 03 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $104 | $165 | Not Implemented |