IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,756

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0654 # 05 Y:2015 05 2015 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,722 $60,000 Not Implemented
OR0654 # 06 Y:2015 06 2015 USE SOLAR HEAT TO MAKE ELECTRICTY $2,026 $9,325 Implemented
BS0058 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,953 $9,195 Not Implemented
BS0058 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,672 $422 Not Implemented
BS0058 # 03 Y:2015 03 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $576 $500 Not Implemented
BS0058 # 04 Y:2015 04 2015 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $273 $739 Not Implemented
BS0058 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,259 $18,330 Not Implemented
BS0058 # 06 Y:2015 06 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,480 $750 Not Implemented
BS0058 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,497 $220 Not Implemented
BS0057 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,976 $14,565 Not Implemented
BS0057 # 02 Y:2015 02 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,516 $910 Not Implemented
BS0057 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,229 $6,050 Not Implemented
BS0057 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $581 $1,800 Not Implemented
BS0057 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,903 $200 Not Implemented
BS0057 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $332 $116 Not Implemented
BS0057 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $11,687 $16,725 Not Implemented
BS0054 # 01 Y:2015 01 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $741 $1,255 Not Implemented
BS0054 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29 $45 Implemented
BS0054 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $597 $4,830 Implemented
BS0054 # 04 Y:2015 04 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $268 $9 Not Implemented
BS0054 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $75 $374 Implemented
BS0054 # 06 Y:2015 06 2015 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,375 $50,351 Not Implemented
BS0053 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,692 $15 Not Implemented
BS0053 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $879 $910 Not Implemented
BS0053 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $826 $968 Not Implemented