IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0304 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $118,243 $1,820 Implemented
MS0304 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,366 $16,063 Implemented
MS0304 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $7,010 $153 Implemented
CO0592 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $242 $462 Implemented
CO0592 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $910 $270 Implemented
CO0592 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $180 $80 Not Implemented
CO0592 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,310 $21,480 Not Implemented
CO0592 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,310 $6,180 Not Implemented
CO0592 # 06 Y:2006 06 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,650 $2,950 Not Implemented
UU0106 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $19,900 $40,020 Not Implemented
UU0106 # 02 Y:2006 02 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $43,630 $20,000 Not Implemented
UU0106 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,510 $3,780 Not Implemented
UU0106 # 04 Y:2006 04 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,120 $4,000 Not Implemented
UU0106 # 05 Y:2006 05 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $23,010 $7,390 Not Implemented
UU0106 # 06 Y:2006 06 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $590 $500 Not Implemented
UU0108 # 01 Y:2006 01 2006 OPTIMIZE PLANT POWER FACTOR $3,970 $3,720 Not Implemented
UU0108 # 02 Y:2006 02 2006 USE DEMAND CONTROLLER OR LOAD SHEDDER $28,070 $10,000 Not Implemented
UU0108 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,560 $2,670 Not Implemented
UU0108 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,120 $4,365 Not Implemented
UU0108 # 05 Y:2006 05 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,940 $30,000 Not Implemented
SU0245 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,880 $0 Not Implemented
SU0245 # 02 Y:2006 02 2006 PAY BILLS ON TIME TO AVOID LATE FEES $2,053 $0 Implemented
SU0245 # 03 Y:2006 03 2006 USE SYNTHETIC LUBRICANT $1,502 $0 Implemented
SU0245 # 04 Y:2006 04 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $281 $0 Not Implemented
SU0245 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,666 $770 Implemented