IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0049 # 06 Y:2002 06 2002 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE $3,658 $3,000 Implemented
MI0048 # 01 Y:2002 01 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,989,000 $115,000 Implemented
MI0048 # 02 Y:2002 02 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,989,000 $7,850 Not Implemented
MI0048 # 03 Y:2002 03 2002 CLEAR AND RENT EXISTING SPACE $123,500 $300 Not Implemented
MI0048 # 04 Y:2002 04 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,814 $4,500 Not Implemented
MI0048 # 05 Y:2002 05 2002 ADD AREA LIGHTING SWITCHES $1,911 $350 Implemented
MI0048 # 06 Y:2002 06 2002 METER WASTE WATER $577 $1,454 Not Implemented
UF0309 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,113 $340 Implemented
UF0309 # 02 Y:2002 02 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,774 $3,840 Implemented
UF0309 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,173 $23,719 Implemented
UF0309 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $959 $256 Not Implemented
UF0309 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,285 $0 Not Implemented
UF0309 # 06 Y:2002 06 2002 RECYCLE WHITE WATER $334,620 $75,000 Not Implemented
UF0309 # 07 Y:2002 07 2002 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $1,560 $1,176 Not Implemented
UF0309 # 08 Y:2002 08 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,500 $0 Not Implemented
UF0309 # 09 Y:2002 09 2002 HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME $8,100 $2,160 Implemented
MI0047 # 01 Y:2002 01 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $58,883 $34,500 n/a
MI0047 # 02 Y:2002 02 2002 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $22,579 $7 Not Implemented
MI0047 # 03 Y:2002 03 2002 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $12,504 $209 Not Implemented
MI0047 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,129 $1,916 Not Implemented
MI0047 # 05 Y:2002 05 2002 ADD AREA LIGHTING SWITCHES $10,502 $3,900 Not Implemented
MI0047 # 06 Y:2002 06 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,225 $52 Implemented
UF0308 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,465 $10,121 n/a
UF0308 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,612 $500 n/a
UF0308 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,366 $0 n/a