Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0049 # 06 Y:2002 | 06 | 2002 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $3,658 | $3,000 | Implemented |
MI0048 # 01 Y:2002 | 01 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,989,000 | $115,000 | Implemented |
MI0048 # 02 Y:2002 | 02 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,989,000 | $7,850 | Not Implemented |
MI0048 # 03 Y:2002 | 03 | 2002 | CLEAR AND RENT EXISTING SPACE | $123,500 | $300 | Not Implemented |
MI0048 # 04 Y:2002 | 04 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,814 | $4,500 | Not Implemented |
MI0048 # 05 Y:2002 | 05 | 2002 | ADD AREA LIGHTING SWITCHES | $1,911 | $350 | Implemented |
MI0048 # 06 Y:2002 | 06 | 2002 | METER WASTE WATER | $577 | $1,454 | Not Implemented |
UF0309 # 01 Y:2002 | 01 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,113 | $340 | Implemented |
UF0309 # 02 Y:2002 | 02 | 2002 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,774 | $3,840 | Implemented |
UF0309 # 03 Y:2002 | 03 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,173 | $23,719 | Implemented |
UF0309 # 04 Y:2002 | 04 | 2002 | INSULATE BARE EQUIPMENT | $959 | $256 | Not Implemented |
UF0309 # 05 Y:2002 | 05 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,285 | $0 | Not Implemented |
UF0309 # 06 Y:2002 | 06 | 2002 | RECYCLE WHITE WATER | $334,620 | $75,000 | Not Implemented |
UF0309 # 07 Y:2002 | 07 | 2002 | INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM | $1,560 | $1,176 | Not Implemented |
UF0309 # 08 Y:2002 | 08 | 2002 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $2,500 | $0 | Not Implemented |
UF0309 # 09 Y:2002 | 09 | 2002 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $8,100 | $2,160 | Implemented |
MI0047 # 01 Y:2002 | 01 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $58,883 | $34,500 | n/a |
MI0047 # 02 Y:2002 | 02 | 2002 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $22,579 | $7 | Not Implemented |
MI0047 # 03 Y:2002 | 03 | 2002 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $12,504 | $209 | Not Implemented |
MI0047 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,129 | $1,916 | Not Implemented |
MI0047 # 05 Y:2002 | 05 | 2002 | ADD AREA LIGHTING SWITCHES | $10,502 | $3,900 | Not Implemented |
MI0047 # 06 Y:2002 | 06 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,225 | $52 | Implemented |
UF0308 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,465 | $10,121 | n/a |
UF0308 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,612 | $500 | n/a |
UF0308 # 03 Y:2002 | 03 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,366 | $0 | n/a |