Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,576
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0431 # 07 Y:2003 | 07 | 2003 | PAY BILLS ON TIME TO AVOID LATE FEES | $750 | $0 | Implemented |
AM0431 # 08 Y:2003 | 08 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,150 | $0 | Implemented |
AM0431 # 09 Y:2003 | 09 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,130 | $0 | Implemented |
AM0431 # 10 Y:2003 | 10 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $780 | $1,520 | Not Implemented |
AM0431 # 11 Y:2003 | 11 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $760 | $0 | Implemented |
AM0430 # 01 Y:2003 | 01 | 2003 | USE WATER-BASED ADHESIVES | $51,560 | $10,000 | Not Implemented |
AM0430 # 02 Y:2003 | 02 | 2003 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,620 | $340 | Not Implemented |
AM0430 # 03 Y:2003 | 03 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,770 | $9,000 | Not Implemented |
AM0430 # 04 Y:2003 | 04 | 2003 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $2,840 | $700 | Implemented |
AM0430 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,300 | $0 | Implemented |
AM0430 # 06 Y:2003 | 06 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $850 | $77 | Implemented |
AM0430 # 07 Y:2003 | 07 | 2003 | REUSE RAGS UNTIL COMPLETELY SOILED | $795 | $0 | Implemented |
AM0430 # 08 Y:2003 | 08 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $280 | $90 | Not Implemented |
AM0430 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $260 | $630 | Not Implemented |
AM0430 # 10 Y:2003 | 10 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $180 | $0 | Implemented |
AM0429 # 01 Y:2003 | 01 | 2003 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $13,000 | $0 | Not Implemented |
AM0429 # 02 Y:2003 | 02 | 2003 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $2,770 | $7,800 | Not Implemented |
AM0429 # 03 Y:2003 | 03 | 2003 | UPGRADE OBSOLETE EQUIPMENT | $830 | $6,540 | Not Implemented |
AM0429 # 04 Y:2003 | 04 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $500 | $200 | Implemented |
AM0429 # 05 Y:2003 | 05 | 2003 | USE SYNTHETIC LUBRICANT | $101 | $0 | Not Implemented |
AM0428 # 01 Y:2003 | 01 | 2003 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $13,600 | $4,000 | Implemented |
AM0428 # 02 Y:2003 | 02 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,180 | $500 | Not Implemented |
AM0428 # 03 Y:2003 | 03 | 2003 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,020 | $0 | Implemented |
AM0427 # 01 Y:2003 | 01 | 2003 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $11,250 | $500 | Implemented |
AM0427 # 02 Y:2003 | 02 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,400 | $820 | Implemented |