IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0326 # 11 Y:2006 11 2006 OPTIMIZE PLANT POWER FACTOR $5,083 $8,900 Not Implemented
SF0326 # 12 Y:2006 12 2006 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $9,275 $45,540 Not Implemented
SD0379 # 01 Y:2006 01 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $212,485 $900,288 Not Implemented
SD0379 # 02 Y:2006 02 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $169,122 $0 Not Implemented
SD0379 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $110,534 $160,385 Not Implemented
SD0379 # 04 Y:2006 04 2006 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $82,170 $150,000 Not Implemented
SD0379 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,140 $18,110 Not Implemented
SD0379 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,974 $220 Implemented
LM0113 # 01 Y:2006 01 2006 CONDENSE OPERATION INTO ONE BUILDING $333,734 $180,000 Not Implemented
LM0113 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,650 $16,170 Not Implemented
LM0113 # 03 Y:2006 03 2006 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $35,020 $500 Not Implemented
LM0112 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $615 $200 Implemented
LM0112 # 02 Y:2006 02 2006 ADJUST VENTS TO MINIMIZE ENERGY USE $19,700 $0 Not Implemented
LM0112 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,130 $8,728 Implemented
LM0112 # 04 Y:2006 04 2006 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $433,948 $1,000 Not Implemented
LM0112 # 05 Y:2006 05 2006 MODIFY STARTUP/SHUTDOWN TIMES $10,000 $0 Not Implemented
LM0112 # 06 Y:2006 06 2006 ADD ADDITIONAL PRODUCTION SHIFT $1,348 $0 Implemented
SF0325 # 01 Y:2006 01 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,756 $0 Not Implemented
SF0325 # 02 Y:2006 02 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,307 $25,760 Not Implemented
SF0325 # 03 Y:2006 03 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,518 $25,760 Not Implemented
SF0325 # 04 Y:2006 04 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $11,700 $1,150 Not Implemented
SF0325 # 05 Y:2006 05 2006 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $15,438 $8,485 Not Implemented
SF0325 # 06 Y:2006 06 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,876 $22,500 Not Implemented
LM0111 # 01 Y:2006 01 2006 USE OPTIMUM TEMPERATURE $1,018 $0 Not Implemented
LM0111 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $2,109 $3,000 Implemented