Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,105
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0426 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,570 | $6,080 | Not Implemented |
OR0426 # 07 Y:2003 | 07 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $199 | $0 | Implemented |
SU0152 # 01 Y:2003 | 01 | 2003 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,627 | $14,850 | n/a |
SU0152 # 02 Y:2003 | 02 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,105 | $110 | n/a |
SU0152 # 03 Y:2003 | 03 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,683 | $10,300 | n/a |
SU0152 # 04 Y:2003 | 04 | 2003 | OPTIMIZE PLANT POWER FACTOR | $5,043 | $16,500 | n/a |
SU0152 # 05 Y:2003 | 05 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,217 | $160 | n/a |
SU0152 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,659 | $270 | n/a |
SU0152 # 07 Y:2003 | 07 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,192 | $103 | n/a |
OR0425 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,195,313 | $104,295 | Not Implemented |
OR0425 # 02 Y:2003 | 02 | 2003 | INSTALL AUTOMATIC PACKING EQUIPMENT | $484,000 | $420,000 | Not Implemented |
OR0425 # 03 Y:2003 | 03 | 2003 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $121,380 | $120,000 | n/a |
OR0425 # 04 Y:2003 | 04 | 2003 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $190,600 | $553,000 | Not Implemented |
OR0425 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,015 | $0 | Implemented |
OR0425 # 06 Y:2003 | 06 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,764 | $18,975 | Not Implemented |
OR0425 # 07 Y:2003 | 07 | 2003 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $73,678 | $282,688 | Not Implemented |
GT0746 # 01 Y:2003 | 01 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $11,932 | $44,000 | Not Implemented |
GT0746 # 02 Y:2003 | 02 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,422 | $0 | Not Implemented |
GT0746 # 03 Y:2003 | 03 | 2003 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,113 | $28,000 | Not Implemented |
GT0746 # 04 Y:2003 | 04 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,727 | $2,500 | Implemented |
GT0746 # 05 Y:2003 | 05 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $593 | $0 | Implemented |
GT0746 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,357 | $20,000 | Not Implemented |
GT0746 # 07 Y:2003 | 07 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,222 | $14,500 | Not Implemented |
GT0746 # 08 Y:2003 | 08 | 2003 | INSTALL OCCUPANCY SENSORS | $227 | $150 | Not Implemented |
LL0152 # 01 Y:2003 | 01 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $7,992 | $825 | Implemented |