Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,403
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0143 # 06 Y:1996 | 06 | 1996 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $17,269 | $15,550 | Implemented |
UF0142 # 01 Y:1996 | 01 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,261 | $13,535 | Not Implemented |
UF0142 # 02 Y:1996 | 02 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $28,518 | $0 | Not Implemented |
UF0142 # 03 Y:1996 | 03 | 1996 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $72,393 | $42,350 | Implemented |
UF0142 # 04 Y:1996 | 04 | 1996 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $4,570 | $7,000 | Not Implemented |
UF0142 # 05 Y:1996 | 05 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,011 | $500 | Implemented |
SD0143 # 01 Y:1996 | 01 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,050 | $3,030 | Implemented |
SD0143 # 02 Y:1996 | 02 | 1996 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,102 | $550 | Implemented |
SD0143 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,180 | $4,458 | Implemented |
SD0143 # 04 Y:1996 | 04 | 1996 | INSTALL SPECTRAL REFLECTORS / DELAMP | $2,099 | $2,480 | Implemented |
SD0143 # 05 Y:1996 | 05 | 1996 | INSTALL OCCUPANCY SENSORS | $874 | $410 | Implemented |
SD0143 # 06 Y:1996 | 06 | 1996 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $16,297 | $1,450 | Implemented |
SD0143 # 07 Y:1996 | 07 | 1996 | TREAT AND REUSE RINSE WATERS | $1,000 | $280 | Implemented |
SD0143 # 08 Y:1996 | 08 | 1996 | TREAT AND REUSE RINSE WATERS | $765 | $200 | Implemented |
MA0359 # 01 Y:1996 | 01 | 1996 | INSTALL DRY SPRINKLER SYSTEM OR OTHER METHOD TO REDUCE HEATING REQUIREMENTS | $9,520 | $17,800 | Not Implemented |
MA0359 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,359 | $13,344 | Not Implemented |
MA0359 # 03 Y:1996 | 03 | 1996 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $5,436 | $6,000 | Not Implemented |
MA0359 # 04 Y:1996 | 04 | 1996 | INSTALL OCCUPANCY SENSORS | $933 | $1,440 | Not Implemented |
MA0359 # 05 Y:1996 | 05 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $830 | $0 | Not Implemented |
MA0359 # 06 Y:1996 | 06 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $604 | $350 | Not Implemented |
ME0183 # 01 Y:1996 | 01 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $23,160 | $1,200 | Implemented |
ME0183 # 02 Y:1996 | 02 | 1996 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $18,000 | $26,280 | Not Implemented |
ME0183 # 03 Y:1996 | 03 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,553 | $10,500 | Implemented |
ME0183 # 04 Y:1996 | 04 | 1996 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $8,809 | $0 | Implemented |
ME0183 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,901 | $13,040 | Implemented |