Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0039 # 01 Y:2002 | 01 | 2002 | MOVE PRODUCT USING MECHANICAL MEANS | $115,650 | $10,000 | n/a |
MI0039 # 02 Y:2002 | 02 | 2002 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $73,631 | $42,600 | n/a |
MI0039 # 03 Y:2002 | 03 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,440 | $3,600 | n/a |
MI0039 # 04 Y:2002 | 04 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,734 | $1,300 | n/a |
MI0039 # 05 Y:2002 | 05 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,717 | $7 | n/a |
MI0038 # 01 Y:2002 | 01 | 2002 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $190,000 | $100,000 | Not Implemented |
MI0038 # 02 Y:2002 | 02 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $18,650 | $26,450 | Implemented |
MI0038 # 03 Y:2002 | 03 | 2002 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,094 | $4,500 | Not Implemented |
MI0038 # 04 Y:2002 | 04 | 2002 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,846 | $2,345 | Not Implemented |
MI0038 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $963 | $250 | Implemented |
UF0299 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,988 | $5,732 | Implemented |
UF0299 # 02 Y:2002 | 02 | 2002 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $5,901 | $1,000 | Not Implemented |
UF0299 # 03 Y:2002 | 03 | 2002 | USE PHOTOCELL CONTROLS | $13,442 | $36,067 | Not Implemented |
UF0299 # 04 Y:2002 | 04 | 2002 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $65,908 | $37,050 | Implemented |
UF0299 # 05 Y:2002 | 05 | 2002 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,494 | $0 | Implemented |
UF0299 # 06 Y:2002 | 06 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $45,724 | $81,293 | Implemented |
UF0299 # 07 Y:2002 | 07 | 2002 | RECOVER WASTE HEAT FROM EQUIPMENT | $27,545 | $120,962 | Not Implemented |
UF0299 # 08 Y:2002 | 08 | 2002 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,543 | $0 | Implemented |
UF0299 # 09 Y:2002 | 09 | 2002 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,134 | $0 | Implemented |
UF0299 # 10 Y:2002 | 10 | 2002 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $30,592 | $15,000 | Not Implemented |
UF0299 # 11 Y:2002 | 11 | 2002 | RECYCLE FLUORESCENT LAMPS | $63 | $0 | Implemented |
UF0299 # 12 Y:2002 | 12 | 2002 | INSTALL AUTOMATIC PACKING EQUIPMENT | $126,744 | $400,000 | Not Implemented |
UF0299 # 13 Y:2002 | 13 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,568 | $1,487 | Implemented |
MI0037 # 01 Y:2002 | 01 | 2002 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $31,994 | $1 | Implemented |
MI0037 # 02 Y:2002 | 02 | 2002 | UPGRADE OBSOLETE EQUIPMENT | $12,400 | $24,000 | Implemented |