IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TP0010 # 05 Y:2000 05 2000 COMBINE UTILITY METERS $660 $415 n/a
TP0010 # 06 Y:2000 06 2000 INSTALL OCCUPANCY SENSORS $428 $450 n/a
TP0010 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $173 $267 n/a
TP0010 # 08 Y:2000 08 2000 ADD AREA LIGHTING SWITCHES $111 $0 n/a
UD0586 # 01 Y:2000 01 2000 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $454,896 $340,000 Not Implemented
UD0586 # 02 Y:2000 02 2000 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $99,635 $350,000 Not Implemented
UD0586 # 03 Y:2000 03 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $96,665 $5,000 Not Implemented
UD0586 # 04 Y:2000 04 2000 MINIMIZE WATER USAGE $18,654 $298 Implemented
UD0586 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,183 $0 Implemented
UD0586 # 06 Y:2000 06 2000 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,583 $0 Not Implemented
HO0219 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,633 $18,330 Implemented
HO0219 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $2,714 $5,000 Implemented
HO0219 # 03 Y:2000 03 2000 USE PHOTOCELL CONTROLS $3,386 $1,515 Implemented
HO0219 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,271 $1,500 Implemented
HO0219 # 05 Y:2000 05 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,030 $9,000 Not Implemented
HO0219 # 06 Y:2000 06 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $13,935 $8,000 Implemented
HO0219 # 07 Y:2000 07 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,102 $4,641 Implemented
AM0363 # 01 Y:2000 01 2000 USE WATER BASED SPRAY ABRASIVES INSTEAD OF BAR ABRASIVES $13,500 $70,000 Not Implemented
AM0363 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,540 $500 Implemented
AM0363 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $1,245 $210 Implemented
AM0363 # 04 Y:2000 04 2000 INSTALL OCCUPANCY SENSORS $600 $180 Not Implemented
AM0363 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $470 $215 Implemented
AM0363 # 06 Y:2000 06 2000 USE SYNTHETIC LUBRICANT $180 $0 Not Implemented
HO0218 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,368 $41,546 Implemented
HO0218 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,628 $1,500 Implemented