Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,990
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0717 # 09 Y:2005 | 09 | 2005 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $3,658 | $2,526 | Implemented |
UD0717 # 10 Y:2005 | 10 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,845 | $0 | Not Implemented |
UD0717 # 11 Y:2005 | 11 | 2005 | USE OPTIMUM THICKNESS INSULATION | $1,314 | $1,962 | Not Implemented |
UD0717 # 12 Y:2005 | 12 | 2005 | INSULATE BARE EQUIPMENT | $670 | $780 | Not Implemented |
UD0717 # 13 Y:2005 | 13 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $441 | $882 | Not Implemented |
UD0716 # 01 Y:2005 | 01 | 2005 | USE POWER DURING OFF-PEAK PERIODS | $72,768 | $0 | Not Implemented |
UD0716 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $48,047 | $65,800 | Implemented |
UD0716 # 03 Y:2005 | 03 | 2005 | REVISE SMOKE CLEANUP FROM OPERATIONS | $38,756 | $150,000 | Not Implemented |
UD0716 # 04 Y:2005 | 04 | 2005 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $8,151 | $3,200 | Not Implemented |
UD0716 # 05 Y:2005 | 05 | 2005 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $5,088 | $0 | Not Implemented |
UD0716 # 06 Y:2005 | 06 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,922 | $1,440 | Implemented |
UD0716 # 07 Y:2005 | 07 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $2,750 | $0 | Not Implemented |
UD0716 # 08 Y:2005 | 08 | 2005 | COVER OPEN TANKS | $2,599 | $0 | Not Implemented |
UD0716 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $507 | $0 | Not Implemented |
WV0315 # 01 Y:2005 | 01 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,051 | $901 | Implemented |
WV0315 # 02 Y:2005 | 02 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,726 | $1,000 | Implemented |
WV0315 # 03 Y:2005 | 03 | 2005 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,606 | $3,300 | Not Implemented |
WV0315 # 04 Y:2005 | 04 | 2005 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,658 | $0 | Implemented |
WV0315 # 05 Y:2005 | 05 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,969 | $1,275 | Not Implemented |
WV0315 # 06 Y:2005 | 06 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $1,739 | $1,060 | Not Implemented |
WV0315 # 07 Y:2005 | 07 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,495 | $2,560 | Implemented |
WV0315 # 08 Y:2005 | 08 | 2005 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,438 | $640 | Implemented |
WV0315 # 09 Y:2005 | 09 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,395 | $0 | Not Implemented |
WV0315 # 10 Y:2005 | 10 | 2005 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,126 | $20 | Implemented |
WV0315 # 11 Y:2005 | 11 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $985 | $140 | Implemented |