IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,477

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0624 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,414 $1,073 Implemented
SF0624 # 03 Y:2024 03 2024 USE PHOTOCELL CONTROLS $509 $718 Not Implemented
SF0624 # 04 Y:2024 04 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $14,370 $58,959 Not Implemented
SF0624 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $130,070 $760,719 Implemented
SD0660 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $249,555 $400,591 Not Implemented
SD0660 # 02 Y:2024 02 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,912 $0 Not Implemented
SD0660 # 03 Y:2024 03 2024 USE PHOTOCELL CONTROLS $7,731 $3,463 Not Implemented
SD0660 # 04 Y:2024 04 2024 INSTALL OCCUPANCY SENSORS $7,224 $4,470 Not Implemented
SD0660 # 05 Y:2024 05 2024 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,431,356 $2,700 Not Implemented
SD0660 # 06 Y:2024 06 2024 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $39,277 $137,300 Not Implemented
SD0660 # 07 Y:2024 07 2024 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,963 $0 Not Implemented
SJ0023 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $21,134 $146,494 Not Implemented
SJ0023 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $848 $2,144 Not Implemented
SJ0023 # 03 Y:2024 03 2024 INSTALL OCCUPANCY SENSORS $1,478 $305 Not Implemented
SJ0023 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,823 $2,466 Not Implemented
SJ0023 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,164 $1,874 Not Implemented
SJ0023 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,625 $0 Not Implemented
SJ0023 # 07 Y:2024 07 2024 INSULATE BARE EQUIPMENT $190 $380 Not Implemented
SF0623 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $4,288 $0 Implemented
SF0623 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $4,851 $0 Implemented
SF0623 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,887 $1,146 Implemented
SF0623 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,599 $3,962 Implemented
SF0623 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,720 $4,257 Implemented
SF0622 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,659 $0 n/a
SF0622 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,433 $730 n/a