Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,568
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0678 # 03 Y:2016 | 03 | 2016 | INSULATE BARE EQUIPMENT | $972 | $2,626 | Implemented |
OR0677 # 01 Y:2016 | 01 | 2016 | INSULATE BARE EQUIPMENT | $7,372 | $5,408 | Implemented |
OR0677 # 02 Y:2016 | 02 | 2016 | USE OPTIMUM TEMPERATURE | $1,822 | $300 | Not Implemented |
OR0677 # 03 Y:2016 | 03 | 2016 | REPLACE BOILER | $4,164 | $17,322 | Not Implemented |
OR0677 # 04 Y:2016 | 04 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,583 | $22,256 | Not Implemented |
OR0677 # 05 Y:2016 | 05 | 2016 | INSULATE BARE EQUIPMENT | $2,064 | $658 | Implemented |
OR0677 # 06 Y:2016 | 06 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,207 | $944 | Not Implemented |
OR0676 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,742 | $0 | Not Implemented |
OR0676 # 02 Y:2016 | 02 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,729 | $6,828 | Not Implemented |
OR0676 # 03 Y:2016 | 03 | 2016 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $216,607 | $80,000 | Implemented |
OR0676 # 04 Y:2016 | 04 | 2016 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $11,774 | $7,200 | Implemented |
OR0676 # 05 Y:2016 | 05 | 2016 | ADD AREA LIGHTING SWITCHES | $1,356 | $1,062 | Implemented |
OR0676 # 06 Y:2016 | 06 | 2016 | INSULATE BARE EQUIPMENT | $2,884 | $6,584 | Implemented |
OR0672 # 01 Y:2016 | 01 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $30,924 | $26,614 | Not Implemented |
OR0672 # 02 Y:2016 | 02 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $21,014 | $35,396 | Not Implemented |
OR0672 # 03 Y:2016 | 03 | 2016 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $39,775 | $138,248 | Not Implemented |
OR0671 # 01 Y:2016 | 01 | 2016 | ELIMINATE/REDUCE AN OPERATION | $357,967 | $669,217 | Not Implemented |
OR0671 # 02 Y:2016 | 02 | 2016 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $190,362 | $300,000 | Not Implemented |
OR0671 # 03 Y:2016 | 03 | 2016 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $24,528 | $1,495 | Not Implemented |
OR0671 # 04 Y:2016 | 04 | 2016 | REDESIGN PROCESS | $4,005 | $3,500 | Not Implemented |
OR0671 # 05 Y:2016 | 05 | 2016 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,295 | $1,000 | Implemented |
OR0670 # 03 Y:2016 | 03 | 2016 | INSTALL OCCUPANCY SENSORS | $14,066 | $10,367 | Implemented |
OR0670 # 04 Y:2016 | 04 | 2016 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,978 | $1,314 | Implemented |
OR0670 # 05 Y:2016 | 05 | 2016 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $8,398 | $2,405 | Not Implemented |
OR0670 # 06 Y:2016 | 06 | 2016 | USE SOLAR HEAT TO MAKE ELECTRICTY | $29,141 | $269,109 | Not Implemented |