IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0151 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $781 $1,320 Not Implemented
BD0151 # 06 Y:2000 06 2000 REPROCESS SPENT OILS ON SITE FOR RE-USE $1,181 $800 Not Implemented
BD0151 # 07 Y:2000 07 2000 INSTALL AUTOMATIC PACKING EQUIPMENT $1,932 $8,000 Not Implemented
UD0585 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $40,793 $76,500 Not Implemented
UD0585 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,367 $32,550 Implemented
UD0585 # 03 Y:2000 03 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,347 $100 Implemented
UD0585 # 04 Y:2000 04 2000 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,563 $0 Not Implemented
UD0585 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,729 $16,995 Implemented
UD0585 # 06 Y:2000 06 2000 INSTALL SKYLIGHTS $3,390 $13,560 Not Implemented
UD0585 # 07 Y:2000 07 2000 USE PHOTOCELL CONTROLS $514 $120 Implemented
UM0152 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $200 Implemented
UM0152 # 02 Y:2000 02 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $282 $618 Not Implemented
UM0152 # 03 Y:2000 03 2000 USE LESS WASTEFUL PACKAGING $147,272 $0 Implemented
UM0152 # 04 Y:2000 04 2000 RECOVER AND REUSE COOLING WATER $1,649 $3,826 Implemented
UM0152 # 05 Y:2000 05 2000 METER WASTE WATER $1,288 $500 Not Implemented
UM0152 # 06 Y:2000 06 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $13,333 $1,200 Not Implemented
WI0361 # 01 Y:2000 01 2000 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $25,500 $0 Not Implemented
WI0361 # 02 Y:2000 02 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $14,677 $45,000 Not Implemented
WI0361 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,555 $1,380 Not Implemented
WI0361 # 04 Y:2000 04 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $984 $3,740 Implemented
WI0361 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $894 $0 Not Implemented
WI0361 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $649 $0 Not Implemented
SF0181 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,763 $1,915 Not Implemented
SF0181 # 02 Y:2000 02 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $252 $654 Not Implemented
HO0216 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,337 $24,765 Not Implemented