IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,872

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0103 # 04 Y:1998 04 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,365 $2,376 Implemented
MS0103 # 05 Y:1998 05 1998 BURN WASTE OIL FOR HEAT $8,596 $5,256 Not Implemented
MS0103 # 06 Y:1998 06 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $108,775 $0 Implemented
TN0624 # 01 Y:1998 01 1998 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,949,360 $103,200 Implemented
TN0624 # 02 Y:1998 02 1998 REDUCE SCRAP PRODUCTION $887,305 $103,200 Not Implemented
TN0624 # 03 Y:1998 03 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $17,940 $0 Implemented
TN0624 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,690 $0 Implemented
TN0624 # 05 Y:1998 05 1998 DISCONNECT BALLASTS $3,290 $980 Not Implemented
WI0313 # 01 Y:1998 01 1998 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $4,445 $7,155 Implemented
WI0313 # 02 Y:1998 02 1998 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,183 $4,200 Not Implemented
WI0313 # 03 Y:1998 03 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,208 $2,000 Implemented
WI0313 # 04 Y:1998 04 1998 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $1,667 $2,000 Implemented
WI0313 # 05 Y:1998 05 1998 REPLACE CLOTH RAGS WITH PAPER TOWELS $256 $0 Not Implemented
WI0313 # 06 Y:1998 06 1998 PAY BILLS ON TIME TO AVOID LATE FEES $251 $0 Implemented
AS0218 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $681 $3,333 Not Implemented
AS0218 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $457 $1,200 Not Implemented
AS0218 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $333 $284 Implemented
AS0218 # 04 Y:1998 04 1998 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $417 $320 Implemented
AS0218 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $249 $406 Implemented
AS0218 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,335 $4,124 Implemented
AS0218 # 07 Y:1998 07 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,347 $9,180 Not Implemented
AS0218 # 08 Y:1998 08 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,225 $3,150 Implemented
AS0218 # 09 Y:1998 09 1998 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,775 $60 Implemented
AS0218 # 10 Y:1998 10 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $941 $60 Implemented
AS0218 # 11 Y:1998 11 1998 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $1,609,654 $4,960 Not Implemented