Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,872
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0103 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,365 | $2,376 | Implemented |
MS0103 # 05 Y:1998 | 05 | 1998 | BURN WASTE OIL FOR HEAT | $8,596 | $5,256 | Not Implemented |
MS0103 # 06 Y:1998 | 06 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $108,775 | $0 | Implemented |
TN0624 # 01 Y:1998 | 01 | 1998 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $1,949,360 | $103,200 | Implemented |
TN0624 # 02 Y:1998 | 02 | 1998 | REDUCE SCRAP PRODUCTION | $887,305 | $103,200 | Not Implemented |
TN0624 # 03 Y:1998 | 03 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $17,940 | $0 | Implemented |
TN0624 # 04 Y:1998 | 04 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,690 | $0 | Implemented |
TN0624 # 05 Y:1998 | 05 | 1998 | DISCONNECT BALLASTS | $3,290 | $980 | Not Implemented |
WI0313 # 01 Y:1998 | 01 | 1998 | REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF | $4,445 | $7,155 | Implemented |
WI0313 # 02 Y:1998 | 02 | 1998 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,183 | $4,200 | Not Implemented |
WI0313 # 03 Y:1998 | 03 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,208 | $2,000 | Implemented |
WI0313 # 04 Y:1998 | 04 | 1998 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,667 | $2,000 | Implemented |
WI0313 # 05 Y:1998 | 05 | 1998 | REPLACE CLOTH RAGS WITH PAPER TOWELS | $256 | $0 | Not Implemented |
WI0313 # 06 Y:1998 | 06 | 1998 | PAY BILLS ON TIME TO AVOID LATE FEES | $251 | $0 | Implemented |
AS0218 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $681 | $3,333 | Not Implemented |
AS0218 # 02 Y:1998 | 02 | 1998 | INSTALL OCCUPANCY SENSORS | $457 | $1,200 | Not Implemented |
AS0218 # 03 Y:1998 | 03 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $333 | $284 | Implemented |
AS0218 # 04 Y:1998 | 04 | 1998 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $417 | $320 | Implemented |
AS0218 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $249 | $406 | Implemented |
AS0218 # 06 Y:1998 | 06 | 1998 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,335 | $4,124 | Implemented |
AS0218 # 07 Y:1998 | 07 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,347 | $9,180 | Not Implemented |
AS0218 # 08 Y:1998 | 08 | 1998 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,225 | $3,150 | Implemented |
AS0218 # 09 Y:1998 | 09 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,775 | $60 | Implemented |
AS0218 # 10 Y:1998 | 10 | 1998 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $941 | $60 | Implemented |
AS0218 # 11 Y:1998 | 11 | 1998 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $1,609,654 | $4,960 | Not Implemented |