Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0157 # 06 Y:1999 | 06 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $19,132 | $49,350 | Not Implemented |
SF0157 # 07 Y:1999 | 07 | 1999 | ADOPT IN-HOUSE MATERIAL GENERATION | $78,960 | $30,000 | Not Implemented |
WI0337 # 01 Y:1999 | 01 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $68,050 | $1,000 | Not Implemented |
WI0337 # 02 Y:1999 | 02 | 1999 | INSTALL TIMERS AND/OR THERMOSTATS | $11,924 | $1,600 | Not Implemented |
WI0337 # 03 Y:1999 | 03 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $5,222 | $5,700 | Implemented |
WI0337 # 04 Y:1999 | 04 | 1999 | DISTILL CONTAMINATED SOLVENTS FOR REUSE | $3,492 | $6,000 | Not Implemented |
WI0337 # 05 Y:1999 | 05 | 1999 | USE EVAPORATION TO CONCENTRATE MATERIAL | $3,019 | $10,000 | Not Implemented |
WI0337 # 06 Y:1999 | 06 | 1999 | REDUCE VENTILATION AIR | $2,871 | $500 | Not Implemented |
WI0337 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,551 | $0 | Implemented |
WI0337 # 08 Y:1999 | 08 | 1999 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $990 | $5,024 | Implemented |
WI0337 # 09 Y:1999 | 09 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $433 | $640 | Implemented |
WI0337 # 10 Y:1999 | 10 | 1999 | COMBINE UTILITY METERS | $562 | $200 | Not Implemented |
WI0337 # 11 Y:1999 | 11 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $400 | $809 | Not Implemented |
WI0337 # 12 Y:1999 | 12 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $177 | $170 | Not Implemented |
UF0216 # 01 Y:1999 | 01 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $50,699 | $251,200 | Not Implemented |
UF0216 # 02 Y:1999 | 02 | 1999 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $11,441 | $0 | Not Implemented |
UF0216 # 03 Y:1999 | 03 | 1999 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $6,211 | $0 | Implemented |
UF0216 # 04 Y:1999 | 04 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $11,243 | $1,800 | Not Implemented |
UF0216 # 05 Y:1999 | 05 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $5,200 | $0 | Not Implemented |
UF0216 # 06 Y:1999 | 06 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,365 | $0 | Implemented |
UM0129 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,119 | $13,195 | Not Implemented |
UM0129 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,707 | $23,612 | Not Implemented |
UM0129 # 03 Y:1999 | 03 | 1999 | REPLACE BOILER | $78,528 | $13,800 | Not Implemented |
UM0129 # 04 Y:1999 | 04 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $24,159 | $17,000 | Not Implemented |
UM0129 # 05 Y:1999 | 05 | 1999 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $56,391 | $122,400 | Not Implemented |