IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,809

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0642 # 06 Y:2023 06 2023 USE BATTERY STORAGE FOR DEMAND CONTROL $4,384 $0 Not Implemented
SD0642 # 07 Y:2023 07 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $325 $847 Not Implemented
SD0642 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,872 $2,290 Not Implemented
SD0642 # 09 Y:2023 09 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,066 $5,607 Not Implemented
UU0228 # 01 Y:2023 01 2023 OPERATE BOILERS ON HIGH FIRE SETTING $5,182 $15,000 Implemented
UU0228 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $3,009 $850 Not Implemented
UU0228 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,221 $85 Not Implemented
UU0228 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,330 $2,040 Not Implemented
UU0228 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $389 $170 Not Implemented
UU0228 # 06 Y:2023 06 2023 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $248 $255 Implemented
UD1062 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,907 $0 Not Implemented
UD1062 # 02 Y:2023 02 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,486 $0 Not Implemented
UD1062 # 03 Y:2023 03 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $705 $260 Not Implemented
UD1062 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $727 $952 Not Implemented
UD1062 # 05 Y:2023 05 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $342 $0 Not Implemented
UD1062 # 06 Y:2023 06 2023 INSTALL OCCUPANCY SENSORS $1,152 $2,000 Implemented
MS0417 # 01 Y:2023 01 2023 INSTALL OCCUPANCY SENSORS $1,912 $3,171 Not Implemented
MS0417 # 02 Y:2023 02 2023 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $2,264 $21,500 Not Implemented
MS0417 # 03 Y:2023 03 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,886 $2,761 Implemented
MS0417 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $210,258 $2,164,995 Not Implemented
AS0557 # 01 Y:2023 01 2023 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $5,610 $960 Not Implemented
AS0557 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,169 $2,419 Implemented
AS0557 # 03 Y:2023 03 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,986 $19,728 Implemented
AS0557 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $1,118 $160 Not Implemented
AS0557 # 05 Y:2023 05 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $333 $284 Implemented