IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,520

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0127 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,282 $250 Not Implemented
UM0127 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,496 $5,000 Not Implemented
UM0127 # 04 Y:1999 04 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $30,552 $35,000 Not Implemented
UM0127 # 05 Y:1999 05 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,705 $13,600 Not Implemented
IA0213 # 05 Y:1999 05 1999 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,000 $2,000 Not Implemented
IA0213 # 06 Y:1999 06 1999 REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING $2,978 $150 Not Implemented
IA0213 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,464 $6,607 Implemented
IA0213 # 02 Y:1999 02 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $659 $50 Implemented
IA0213 # 03 Y:1999 03 1999 DIRECT WARMEST AIR TO COMBUSTION INTAKE $235 $688 Not Implemented
IA0213 # 04 Y:1999 04 1999 INSTALL OCCUPANCY SENSORS $125 $466 Not Implemented
OR0336 # 01 Y:1999 01 1999 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $93,600 $200,000 Implemented
OR0336 # 02 Y:1999 02 1999 INSTALL SENSORS TO DETECT DEFECTS $31,700 $0 Implemented
OR0336 # 03 Y:1999 03 1999 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $27,050 $8,200 Not Implemented
OR0336 # 04 Y:1999 04 1999 OPTIMIZE PLANT POWER FACTOR $3,716 $10,200 Not Implemented
ME0257 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,536 $21,031 Implemented
ME0257 # 02 Y:1999 02 1999 RECOVER WASTE HEAT FROM EQUIPMENT $7,900 $1,000 Implemented
ME0257 # 03 Y:1999 03 1999 ADVERTISE PRODUCT OR SERVICE $2,993 $0 Implemented
ME0257 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,980 $6,797 Implemented
ME0257 # 05 Y:1999 05 1999 INSULATE BARE EQUIPMENT $2,268 $879 Implemented
ME0257 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $920 $20 Implemented
ME0257 # 07 Y:1999 07 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $702 $300 Implemented
ME0257 # 08 Y:1999 08 1999 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $671 $1,960 Not Implemented
ME0257 # 09 Y:1999 09 1999 REDUCE SCRAP PRODUCTION $66,200 $20,000 Implemented
AM0336 # 01 Y:1999 01 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $84,980 $80,500 Implemented
AM0336 # 02 Y:1999 02 1999 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,750 $0 Implemented