Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0127 # 02 Y:1999 | 02 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $16,282 | $250 | Not Implemented |
UM0127 # 03 Y:1999 | 03 | 1999 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $11,496 | $5,000 | Not Implemented |
UM0127 # 04 Y:1999 | 04 | 1999 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $30,552 | $35,000 | Not Implemented |
UM0127 # 05 Y:1999 | 05 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $12,705 | $13,600 | Not Implemented |
IA0213 # 05 Y:1999 | 05 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $4,000 | $2,000 | Not Implemented |
IA0213 # 06 Y:1999 | 06 | 1999 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $2,978 | $150 | Not Implemented |
IA0213 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,464 | $6,607 | Implemented |
IA0213 # 02 Y:1999 | 02 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $659 | $50 | Implemented |
IA0213 # 03 Y:1999 | 03 | 1999 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $235 | $688 | Not Implemented |
IA0213 # 04 Y:1999 | 04 | 1999 | INSTALL OCCUPANCY SENSORS | $125 | $466 | Not Implemented |
OR0336 # 01 Y:1999 | 01 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $93,600 | $200,000 | Implemented |
OR0336 # 02 Y:1999 | 02 | 1999 | INSTALL SENSORS TO DETECT DEFECTS | $31,700 | $0 | Implemented |
OR0336 # 03 Y:1999 | 03 | 1999 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $27,050 | $8,200 | Not Implemented |
OR0336 # 04 Y:1999 | 04 | 1999 | OPTIMIZE PLANT POWER FACTOR | $3,716 | $10,200 | Not Implemented |
ME0257 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,536 | $21,031 | Implemented |
ME0257 # 02 Y:1999 | 02 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,900 | $1,000 | Implemented |
ME0257 # 03 Y:1999 | 03 | 1999 | ADVERTISE PRODUCT OR SERVICE | $2,993 | $0 | Implemented |
ME0257 # 04 Y:1999 | 04 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,980 | $6,797 | Implemented |
ME0257 # 05 Y:1999 | 05 | 1999 | INSULATE BARE EQUIPMENT | $2,268 | $879 | Implemented |
ME0257 # 06 Y:1999 | 06 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $920 | $20 | Implemented |
ME0257 # 07 Y:1999 | 07 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $702 | $300 | Implemented |
ME0257 # 08 Y:1999 | 08 | 1999 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $671 | $1,960 | Not Implemented |
ME0257 # 09 Y:1999 | 09 | 1999 | REDUCE SCRAP PRODUCTION | $66,200 | $20,000 | Implemented |
AM0336 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $84,980 | $80,500 | Implemented |
AM0336 # 02 Y:1999 | 02 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $3,750 | $0 | Implemented |