IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,317

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0583 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,666 $2,560 Not Implemented
WV0583 # 03 Y:2019 03 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,740 $4,320 Not Implemented
WV0583 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,446 $28 Implemented
WV0583 # 05 Y:2019 05 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,448 $0 Implemented
WV0583 # 06 Y:2019 06 2019 UPGRADE CONTROLS ON COMPRESSORS $2,254 $5,905 Not Implemented
WV0583 # 07 Y:2019 07 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,271 $607 Implemented
WV0582 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,656 $56,277 Implemented
WV0582 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,715 $35,838 Implemented
WV0582 # 03 Y:2019 03 2019 SEPARATE CONTROLS OF AIR HANDLERS FROM AC/ HEATING SYSTEMS $9,634 $40,000 Implemented
WV0582 # 04 Y:2019 04 2019 MINIMIZE WATER USAGE $4,552 $7,000 Not Implemented
WV0582 # 05 Y:2019 05 2019 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $432 $1,900 Implemented
WV0582 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $339 $0 Implemented
WV0582 # 07 Y:2019 07 2019 DEVELOP A REPAIR/REPLACE POLICY $121 $563 Implemented
WV0580 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $265,061 $31,000 Not Implemented
WV0580 # 02 Y:2019 02 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $143,962 $6,000 Implemented
WV0580 # 03 Y:2019 03 2019 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $52,590 $160,314 Not Implemented
WV0580 # 04 Y:2019 04 2019 RECOVER WASTE HEAT FROM EQUIPMENT $8,437 $15,360 Implemented
WV0580 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $2,238 $2,550 Implemented
WV0580 # 06 Y:2019 06 2019 REPAIR OR REPLACE STEAM TRAPS $1,791 $5,731 Implemented
WV0577 # 01 Y:2019 01 2019 UPGRADE CONTROLS ON COMPRESSORS $20,384 $16,000 Not Implemented
WV0577 # 02 Y:2019 02 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $11,817 $1,000 Implemented
WV0577 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,672 $25,000 Not Implemented
WV0577 # 04 Y:2019 04 2019 DEVELOP A REPAIR/REPLACE POLICY $9,446 $1,823 Implemented
WV0577 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,439 $0 Implemented
WV0577 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,313 $5,306 Implemented